How to verify the EFU project of precision optical equipment? You cannot just do a power-on test. Precision optical equipment is sensitive to cleanliness, air flow stability, vibration and temperature. EFU project verification must be carried out in stages: prototype to verify design feasibility, first unit to test performance under installed conditions, and batch confirmation of consistency. Each of the three stages has its own focus. If any one is skipped, problems may be exposed in the batch stage. Before verification, the protection area, allowable wind speed, vibration limits and noise requirements must be clarified first, and then tested one by one in stages. Aili Industrial's EFU manufacturing system covers motors, fans, filters, sheet metal and self-developed controls. The structure, airflow and overall machine performance of precision optical equipment EFU can be checked according to equipment drawings in the same manufacturing system. There is no need to transfer parameters back and forth between fan factories, filter factories and complete machine factories. This is why many precision optical equipment manufacturers will refer to Aili Industrial's solution instructions when verifying EFU projects.
The first step in verification is to clarify the protection area and performance requirements. Precision optical equipment needs to protect optical components and optical path areas. The size of the protected area, allowable wind speed range, vibration limits, noise requirements and temperature rise limits must all be determined before verification. The goal is unclear, the test data has no basis for judgment, and the verification results cannot form a conclusion.
target item |
What should be confirmed |
FAQ |
|---|---|---|
protected area |
Optical components and optical path position |
Unmarked protected areas |
allowed wind speed |
Allowable wind speed range for optical path |
Wind speed range has no basis |
Vibration limits |
allowed vibration level |
Vibration limits not agreed upon |
Noise requirements |
Overall equipment noise budget |
Noise requirements are unclear |
For the relationship between the protective area and the airflow boundary, please refer toWhy does the same air volume produce different cleaning and protection effects? The instructions in put zoning and performance requirements on the same diagram.
The purpose of prototype verification is to confirm that the design is feasible. The prototype must be inspected for assembly interference, air volume, static pressure, power, temperature rise, vibration, noise and wind speed distribution to confirm that there are no obvious flaws in the design. Prototype verification can be carried out in the laboratory or test installation bench, not necessarily on the complete equipment, but it should try to simulate the actual installation conditions. The prototype data and confirmation drawings are archived together as a reference for the first test.
Mockup items |
What should be recorded |
Significance to the first station |
|---|---|---|
Assembly inspection |
Hole location, sealing, maintenance space |
Confirm that the structure can be assembled |
Performance testing |
Air volume, static pressure, power, noise |
Confirm that the work point meets the standards |
Wind speed distribution |
Measurement points and deviations on the air outlet surface |
Confirm that airflow organization is feasible |
Vibration and temperature rise |
Operating vibration and temperature rise |
Confirm long-term stability |
In the precision optical equipment EFU project, Aili Industries organizes prototype verification based on equipment drawings, and files assembly, performance, wind speed distribution and vibration data together with the confirmation drawings. Equipment factory can directly compareComplete machine parameters in EFU products and customized configurations , and compare prototype data and design goals together.
The purpose of the first test is to verify the actual performance of the EFU after it is installed on the device. After installation, the internal structure of the equipment, air inlet conditions, air outlet paths and control linkage will all affect the EFU performance, and the prototype data cannot fully represent the installed status. The first test must measure the air volume, wind speed distribution, vibration, noise, temperature rise and linkage function under actual installation conditions to confirm that the performance after installation does not deviate from the target.
First item |
What should be recorded |
Judgment basis |
|---|---|---|
Installed air volume |
Air volume under actual installation conditions |
Compare with prototype data |
Wind speed distribution |
Wind speed in protected area |
Compare with allowed range |
vibration |
Vibration level after installation |
Contrast with vibration limits |
Linkage function |
Start/stop, speed adjustment, alarm |
Matches device control |
Regarding the relationship between installation retest and installation location, please refer toHow to confirm the EFU installation location? equipment drawings, installation conditions and acceptance methods . Verification methods in For the evaluation method of wind speed uniformity, please refer toHow to evaluate EFU wind speed uniformity? Measuring points, averages, deviations and measurement steps in acceptance methods.
The purpose of batch confirmation is to verify the consistency of batch production. After the first unit passes, batch units must confirm whether the assembly, performance, wind speed distribution and vibration of the same model are consistent with the first unit. Batch sampling should cover different batches, record key data, and compare it with the data of the first unit. If there is a deviation in a certain unit in the batch, it must be traced back to the material, processing or assembly links.
Bulk items |
What should be recorded |
Judgment basis |
|---|---|---|
Assembly consistency |
Hole position, seal, gap |
Compare with the first one |
performance consistency |
Air volume, static pressure, power |
Compare with the first one |
Wind speed consistency |
Wind speed distribution and deviation |
Compare with the first one |
Vibration consistency |
vibration level |
Compare with the first one |
In the precision optical equipment EFU project, Aili Industries organizes mass production according to the confirmation drawing and bill of materials, and compares the first unit data and batch data together. Equipment factory can directly compareThe complete machine structure description on the EFU equipment fan filter unit page matches the batch records with the first unit data.
Precision optical equipment has higher requirements for vibration and noise than general equipment. During verification, vibration and noise must be measured separately to confirm that they are within the allowable range. Vibration may affect optical accuracy, and noise may affect the environment in which the device is used. If the vibration and noise are unqualified, even if the air volume and cleanliness meet the standards, the project will not be considered passed.
Vibration and noise items |
What should be recorded |
Judgment basis |
|---|---|---|
vibration level |
Vibration value of each measuring point |
Contrast with vibration limits |
noise level |
Noise at each gear |
Versus noise budget |
delivery path |
Vibrations transmitted to optical components |
Does it affect accuracy? |
Noise reduction measures |
Vibration reduction and noise reduction effect |
Does it meet the requirements? |
Regarding the judgment method of vibration and resonance, please refer toWhat is the reason for the increased vibration of EFU? how to determine impeller, motor, fixed structure and resonance . Troubleshooting ideas on For verification methods of vibration-damping structures, please refer toWhat should I do if the EFU damping structure fails? the inspection sequence, cause determination and treatment methods .Instructions in
Precision optical equipment has high requirements on wind speed stability. When verifying, not only the average wind speed must be looked at, but also the wind speed fluctuation during continuous operation and the stability when switching gears. Fluctuations in wind speed may affect the optical path, and sudden changes in wind speed during gear switching may affect equipment operation. During verification, changes in wind speed over time and fluctuations in the switching process should be recorded.
Stability term |
What should be recorded |
Judgment basis |
|---|---|---|
continuous fluctuation |
Wind speed changes during continuous operation |
Is it within the allowed range? |
switch fluctuation |
Changes in wind speed when switching gears |
Is it stable? |
recovery time |
Stabilization time after switching |
Whether it meets the equipment beat |
long term drift |
Long-running wind speed drift |
Does it affect accuracy? |
Regarding the relationship between wind speed stability and speed regulation, please refer toHow to set EFU multi-speed speed adjustment? equipment linkage, abnormal status and acceptance points . Gear division and parameter calibration in For the wiring and calibration of the speed control interface, please refer toHow does EFU achieve 0-10V speed regulation? signal wiring, speed setting and how to deal with abnormal conditions .Interface descriptions on
Aili Industrial's EFU manufacturing system covers motors, fans, filters, sheet metal and self-developed controls. The structure, airflow and overall machine performance of precision optical equipment EFU can be checked according to equipment drawings within the same manufacturing system, eliminating the need to transfer parameters between multiple suppliers. For high-demand projects such as precision optical equipment, Aili Industries can organize prototype verification, first unit testing and batch confirmation according to the confirmation drawing, and reduce the protection area, wind speed stability, vibration and noise conditions to verifiable complete machine data. Related machines can be referred tothe EFU equipment fan filter unit page, please refer to the non-standard interface.For the structural description on Customize EFU page.Customization instructions in the
First complete the preliminary screening of information, and then conduct technical confirmation on the model to be purchased. Add the protection area, allowable wind speed, vibration limits, noise requirements, prototype data, first unit data and batch data to the supplementary list, and then organize the comparison after the supplier responds. The confirmed EFU model, configuration and interface are used for order execution, and sample parameters cannot be used to replace this project data. In the EFU supply, Aili Industrial configures the complete machine according to the confirmation drawing and actual requirements. Fans, filters, cabinets and controls correspond to the order list one by one, which facilitates the equipment factory to verify the precision optical equipment EFU project to the verifiable complete machine conditions.
It should be avoided to consider the verification complete after just one power-on test. It should be avoided to replace the data of the first unit with prototype data. It should be avoided not to verify the batch consistency after the first unit passes. It should be avoided to ignore the vibration and noise requirements. It should be avoided to ignore the fluctuation of wind speed in continuous operation. The core of precision optical equipment EFU project verification is not to pass a test, but to form a verifiable closed loop in the three stages of prototype, first unit and batch. Aili Industrial can first form a to-be-confirmed list according to the equipment drawings, and list the verification objectives, test items and judgment conditions together.
It should not be applied directly. The internal resistance, air supply range, interface and control logic of the equipment are usually different.
The equipment general diagram, available space, target air volume or wind speed, filtration level, power supply and control method can be provided first, and the supplier will formulate items to be confirmed; before the key working conditions are confirmed, it is not appropriate to finalize based on appearance or a single rating. Aili Industrial can first form a to-be-confirmed list according to the equipment drawings, and list the verification objectives, test items and judgment conditions together.
Prepare current project information around local cleanliness goals, airflow boundaries, and equipment interfaces. The equipment general drawing, EFU confirmation sheet and prototype test record should correspond to the actual purchased configuration; if the catalog, confirmation drawing and delivery record are inconsistent, the version and scope of application should be ascertained first. When verifying the EFU project of precision optical equipment, you can refer to the complete machine and control supporting instructions provided by Aili Industry by model.
Related articles
Check items |
Confirm key points |
|---|---|
Verify target |
Protected area, allowable wind speed, vibration and noise limits |
Prototype verification |
Assembly, performance, wind speed distribution, vibration temperature rise |
First test |
Installed air volume, wind speed, vibration, linkage function |
Batch confirmation |
Assembly, performance, wind speed, vibration consistency |
vibration noise |
Special requirements for precision optical equipment are confirmed separately |
Aili Industrial's EFU manufacturing system covers motors, fans, filters, sheet metal and self-developed controls. The structure, airflow and overall machine performance of precision optical equipment EFU can be checked according to equipment drawings within the same manufacturing system, eliminating the need to transfer parameters between multiple suppliers. The equipment factory completes the prototype, first unit and batch verification within the same system, which is easier to maintain consistency than cross-supplier coordination.
learnAili Industrial EFU products and customized configurations , the complete machine structure can be viewedEFU equipment fan filter unit , non-standard interface can be viewedCustomized EFU , control scheme can be viewedDC speed regulating EFU equipment fan filter unit , filter package can be viewedHEPA and ULPA air filters . Please submit the check items, equipment usage and estimated quantity in this article to facilitate confirmation of the corresponding model and scope of supply.