How to customize non-standard EFU? The starting point is not to draw a box shape first, but to freeze the equipment boundaries and acceptance conditions first. The available space inside the equipment, installation standards, air inlet and outlet directions, filtration levels, target air volume and static pressure, control interfaces, and maintenance routes. These conditions must be confirmed clearly before customization, and then the box structure, hole positions, and internal layout are determined. Make the appearance first and then add the performance. After installing the prototype, you will find that the air volume is insufficient or the interface is incompatible, making modifications more expensive. Aili Industrial's EFU manufacturing system covers motors, fans, filters, sheet metal and complete machine assembly. Non-standard projects can organize confirmation drawings, prototype verification and version solidification according to equipment drawings, and coordinate the structure, power and control conditions in the same manufacturing system. This is why many equipment manufacturers will refer to Aili Industrial's program description when customizing non-standard EFU.
The confirmation drawing of non-standard EFU is not just about the external dimensions. The location of the reference plane, the hole spacing and hole diameter tolerance of the installation holes, the size and direction of the air inlet and outlet, the width of the sealing surface, the maintenance space, and the installation position of the control module must be indicated on the drawing. The drawings only show the length, width and height, and deviations will occur during the processing and assembly stages. The cost of on-site modifications is much higher than the initial confirmation.
drawing item |
What should be indicated |
FAQ |
|---|---|---|
Installation baseline |
Which surface or hole should be used as the positioning reference? |
Only the overall dimensions are given |
Hole position tolerance |
Hole spacing, hole diameter and allowable deviation |
Hole position tolerance is not specified |
Air inlet and outlet |
Dimensions, directions and flange forms |
Does not match device opening |
sealing surface |
Width, flatness and pressing method |
The sealing structure is not shown |
maintenance space |
Filter disassembly and assembly directions and tool space |
Cannot be maintained after installation |
Ai Li industrialEFU products and customized configurations list structural descriptions and supporting interfaces by model. The equipment factory can directly correspond to the specific model during the customization stage, and check the confirmation drawing and the equipment general drawing on the same basis.
The performance parameters of non-standard EFU do not give a separate air volume number. The target air volume, external static pressure, filter level and resistance, allowable noise, and temperature rise limits must be confirmed under the same working conditions. The internal air duct resistance and air outlet structure of the equipment will change the working point of the fan. If you only select the model based on the sample rating, the prototype may not meet the equipment requirements after installation.
Performance items |
What should be confirmed |
Impact on customization |
|---|---|---|
Target air volume |
The actual air supply volume required by the equipment |
Decide on fan and filter selection |
External static pressure |
Equipment internal air duct and air outlet resistance |
Affects fan operating point |
filter level |
Efficiency Requirements and Filter Resistance |
Affects the static pressure requirements of the entire machine |
noise limit |
Allowable noise range of equipment |
Affects fan speed and structure |
Temperature rise limit |
Allowable temperature rise during continuous operation |
Impact on motor and thermal design |
For the calculation relationship between air volume and resistance, please refer toHow to calculate EFU rated air volume? The method in the air supply area, target wind speed and unit conversion method confirms the target air volume and system resistance together, instead of just giving a rated air volume.
The interfaces of non-standard EFU include power interface, control interface and communication interface. The power supply voltage and power, terminal definition, control signal form, communication protocol, address setting method, and alarm output form must be specified in the technical attachment. Just write 'supports speed adjustment' or 'can communicate'. It is not until the joint debugging stage that the protocol is found to be inconsistent, and the cost of rework is very high.
interface item |
What should be confirmed |
FAQ |
|---|---|---|
Power interface |
Voltage, frequency, power, terminal definition |
Does not match device power supply |
control interface |
Start/stop, speed regulation signal form |
Signal levels are incompatible |
Communication interface |
Protocol, address, data format |
Protocol versions are inconsistent |
Alarm output |
Signal form and electrical capacity |
The device cannot receive |
For projects involving control linkage, please refer toHow to implement EFU local speed adjustment? wiring, parameters, control logic and debugging methods , and terminals, signal ranges and exception logic are clearly written in the customization stage.Interface definitions in
For non-standard EFU new structure or new interface projects, it is advisable to make a prototype or first verification first. The prototype must be inspected for assembly interference, air volume, power, temperature rise, vibration and communication logic. It is confirmed that the performance and assembly are satisfactory before solidifying the batch configuration. The prototype data should be filed together with the confirmation drawings and technical attachments as the basis for inspection of subsequent batches.
Verification items |
What should be recorded |
What it means for batch size |
|---|---|---|
Assembly inspection |
Hole location, sealing, maintenance space |
Confirm that the structure can be assembled |
Performance testing |
Air volume, static pressure, power, noise |
Confirm that the work point meets the standards |
Temperature rise and vibration |
Continuous operation temperature rise and vibration |
Confirm long-term stable operation |
Communication test |
Protocol, address, alarm feedback |
Confirm that the interface is available |
In non-standard EFU projects, Aili Industries organizes prototypes or first unit verification according to equipment drawings, files assembly, performance and control test results together with confirmation drawings, and then solidifies batch configuration. Equipment factories complete prototypes and batches within the same manufacturing system, making it easier to maintain version consistency than cross-supplier coordination.
After the prototype is approved, the confirmation drawing, bill of materials, control parameters and inspection records must be formed into a fixed version. Subsequent batches are executed according to the same version, and changes must be approved and synchronized to drawings and materials. If the version is not solidified, configuration deviations may occur in subsequent batches, and spare parts and maintenance may also be affected.
Cured items |
What should be confirmed |
|---|---|
Drawing version |
Confirmation drawing and processing drawing refer to the same version |
bill of materials |
Fans, filters, and controller models are fixed |
control parameters |
Speed mapping, address and alarm settings |
Inspection records |
The first unit is consistent with the batch inspection items |
For projects involving batch delivery, please refer toWhen does a non-standard EFU box need to be customized? structural boundaries, technical protocols and acceptance points correspond to structural changes and batch configuration.The version management ideas in
First complete the preliminary screening of information, and then conduct technical confirmation on the model to be purchased. Include confirmation diagrams, performance parameters, interface definitions, prototype verification and version solidification in the supplementary list, and organize comparisons after the supplier responds. The confirmed drawings, configurations and interfaces are used for order execution, and sample parameters cannot be used to replace this project data. In the supply of non-standard EFU, Aili Industrial configures the complete machine according to the confirmation drawing and actual requirements. The structure, filter, fan and control correspond to each item in the order list, which facilitates the equipment manufacturer to place customized requirements on the verifiable complete machine conditions.
You should avoid making the appearance first and then supplementing the performance. You should avoid confirming that the drawing only shows the outer dimensions without reference and tolerance. You should avoid the interface definition that only says 'support speed adjustment' but not the terminals and protocols. You should avoid skipping the prototype and going directly to batches. Whether non-standard EFU can skip the prototype and go directly to batch depends on the structure and the risks of new interfaces; new structure or new interface projects should first verify the prototype or the first unit, and then solidify the batch configuration after confirming the performance and assembly. Aili Industrial can first form a to-be-confirmed list according to the equipment drawings, listing the structure, performance and interface conditions together.
For new structure or new interface projects, it is recommended to verify the prototype or the first unit first, and then solidify the batch configuration after confirming the performance and assembly.
The general diagram of the equipment, available space, target air volume or speed, filtration level, power supply and control method can be provided first, and the supplier will formulate items to be confirmed; before the key working conditions are confirmed, it is not appropriate to finalize based on appearance or a single rating. Aili Industrial can first form a to-be-confirmed list according to the equipment drawings, listing the structure, performance and interface conditions together.
Prepare current project materials around confirmation diagrams, performance conditions, prototype verification and version solidification. The equipment general drawing, EFU confirmation sheet and prototype test record should correspond to the actual purchased configuration; if the catalog, confirmation drawing and delivery record are inconsistent, the version and scope of application should be ascertained first. When customizing non-standard EFU, you can refer to the structure, performance and interface supporting instructions provided by Aili Industry by model.
Related articles
Check items |
Confirm key points |
|---|---|
Confirmation picture |
Datum, tolerance, interface standard definition |
Performance parameters |
Air volume, static pressure, filtration, and noise are determined together |
Interface definition |
Power supply, control and communication written clearly |
Prototype verification |
The first data determines the batch size |
Version solidification |
Drawings, materials and parameters are consistent |
Aili Industrial's EFU manufacturing system covers motors, fans, filters, sheet metal and complete machine assembly. The structure, power and control conditions of non-standard projects can be checked according to equipment drawings within the same manufacturing system, instead of confirming the unit based on only one external dimension. Equipment factories complete prototypes and batches within the same system, making it easier to maintain version consistency than cross-supplier coordination.
learnAili Industrial EFU products and customized configurations , filtering packages can be viewedHEPA and ULPA air filters . Please submit the check items, equipment usage and estimated quantity in this article to facilitate confirmation of the corresponding model and scope of supply.