Number of views: 4422 Author: Aili Industry Release time: 2027-01-27 Source: Ai Li Industrial
How to confirm the EFU installation hole position? It is not to compare the unit on the equipment and drill holes if they match. The installation hole location involves datum selection, hole spacing tolerance, fixing method, sealing surface compression and installation retest. If the hole position is a little off, the box will receive uneven force when tightening, the sealing surface will not be pressed tightly, and air leakage or vibration may occur during operation. The hole position is correct but the fixing method is unreasonable, the box will be deformed, and the filter seal will fail. The hole position and sealing surface are connected together. When confirming the hole position, check the sealing surface at the same time. Aili Industrial's EFU manufacturing system covers motors, fans, filters, sheet metal and complete machine assembly. The sheet metal processing, box stiffness and complete machine interfaces involved in the mounting hole positions can be checked according to the equipment drawings in the same manufacturing system. There is no need to go back and forth between the sheet metal factory, the fan factory and the complete machine factory for confirmation. This is why many equipment manufacturers will refer to the Aili Industrial structural instructions when confirming the EFU mounting hole positions.
The first step to confirm the hole location is to select the installation benchmark. The datum can be a mounting surface on the equipment, a pilot hole, or a structural edge. After the datum is selected, all hole dimensions are marked based on the datum, so that processing and assembly have a consistent reference. The benchmark is not clear, there is no unified starting point for the hole size on the drawing, and processing and assembly are based on different understandings, so the hole position is easy to deviate.
benchmark item |
What should be confirmed |
FAQ |
|---|---|---|
Installation baseline |
Which side or hole of the device is positioned? |
Drawings not marked with datum |
base pass |
Mapping from device baseline to EFU baseline |
Baseline conversion unspecified |
Hole location marking |
Hole spacing is marked from the datum |
There is no unified starting point for hole size |
direction sign |
Inlet and outlet air direction and installation direction |
Direction is unclear |
Ai Li industrialEFU products and customized configurations list the overall dimensions and installation interfaces by model. Equipment manufacturers can directly correspond to specific models when selecting benchmarks, and put the equipment benchmark and EFU benchmark on the same confirmation diagram.
Hole position confirmation is not just about hole spacing. The hole diameter determines the bolt specifications, the hole spacing determines the hole location distribution, and the position determines the deviation range of the hole location relative to the datum. The three should be written clearly together. If only the hole distance is written but not the hole diameter, the bolts may not fit in; if only the hole diameter is written but not the position, the hole offset range is unclear, and the holes may need to be aligned during assembly.
Hole location item |
What should be confirmed |
FAQ |
|---|---|---|
Aperture |
Bolt specifications and hole diameter match |
Hole diameter does not match bolt |
Hole spacing |
The distance between holes |
Hole spacing tolerance is not specified |
Location |
Deviation of hole position relative to datum |
Location not agreed upon |
Number of holes |
Number and distribution of fastening points |
Insufficient fastening points |
Aili Industrial controls the hole diameter, hole spacing and position according to the confirmation drawing during EFU manufacturing. When checking the hole position, the equipment factory can directly refer to the drawing and put the hole diameter, hole spacing and position in the same inspection sheet.
The fixing method determines how the holes are used. For bolt fixing, confirm the bolt specifications, tightening torque and anti-loosening measures; for buckle fixation, confirm the buckle position and buckle force; for press frame fixation, confirm the coordination between the press frame and the box. The fixing methods are different, the hole position requirements and the sealing surface pressing methods are also different. If the fixing method is not confirmed, the hole position may be correct and the cover may not be pressed tightly.
Fixed items |
What should be confirmed |
FAQ |
|---|---|---|
bolted |
Bolt specifications, torque, anti-loosening |
Torque not agreed |
Buckle fixed |
Buckle position and buckle force |
Insufficient snapping force |
Press frame fixed |
Matching the pressure frame and the box body |
Pressure frame deformation |
Installation order |
Which side should be fixed first and which side should be fixed last? |
Sequential misalignment creates stress |
For the relationship between fixation methods and load-bearing, please refer toWhat should we pay attention to when loading EFU equipment? structural, electrical, commissioning and rectification points .Support and fastening check methods in
The sealing surface is an easily overlooked part in hole location confirmation. If the hole position is off, the box will receive uneven force when tightening, the sealing surface will be unevenly pressed, and some parts may not be pressed tightly; the sealing surface itself is uneven, and the hole position will not be pressed tightly even if the hole position is accurate. When confirming the hole position, check the flatness, width and tightening method of the sealing surface at the same time to confirm that the sealing surface can fit evenly after tightening.
sealed items |
What should be confirmed |
FAQ |
|---|---|---|
Sealing surface flatness |
Is the sealing surface flat? |
Seal surface warping |
Sealing surface width |
Whether the requirements for beading or sealant are met |
Not enough width |
Pressing method |
Bolts, buckles or press frames |
Uneven compression |
Reinstallation requirements |
How to restore seal after maintenance |
Bypass after reassembly |
Regarding the relationship between the sealing surface and the seal of the whole machine, please refer toHow to confirm EFU installation seal? equipment drawings, installation conditions and acceptance methods . Verification methods in Filter packages can be viewedHEPA vs. ULPA air filters page.Sealing instructions on
Confirmation of hole locations does not end when the drawings are matched. After the EFU is installed on the equipment, check whether the holes are aligned, whether the box is deformed after tightening, whether the sealing surface fits well, and whether the operating vibration is within the allowable range. The retest data should be compared with those before installation. If the difference is large, check the datum, hole position and fastening status, rather than directly judging that there is a problem with the EFU itself.
Retest items |
What should be recorded |
Judgment basis |
|---|---|---|
Hole alignment |
Can the bolt pass through smoothly? |
Compare with confirmation picture |
Cabinet deformation |
Changes in appearance before and after tightening |
Deformation record |
Sealed fit |
Is the sealing surface pressed evenly? |
Seal inspection |
vibration state |
Vibration levels in operation |
Does it affect the equipment? |
In the EFU project, Aili Industry organized installation retest according to the equipment drawings and agreed working conditions, and verified the hole position, sealing and vibration data together. Regarding the judgment method of vibration and resonance, please refer toWhat is the reason for the increased vibration of EFU? how to determine impeller, motor, fixed structure and resonance .Troubleshooting ideas on
If the re-test finds hole position deviation or loose sealing, the rectification method should correspond to the reason. If the hole position is off, check the datum and processing dimensions, and reprocess or add an adapter plate if necessary; if the box is deformed, check the tightening sequence and torque; if the sealing surface is not sticking, check the flatness and compression method. After rectification, re-test is required to confirm that the hole position, sealing and vibration are back to the normal range, and the installation record is updated.
Rectification items |
What should be confirmed |
Recording requirements |
|---|---|---|
Hole position correction |
Reprocess or add adapter board |
Rectification records |
Tightening adjustment |
Torque and Sequence |
Fastening records |
Sealing surface treatment |
Flatness repair or compression adjustment |
Seal inspection record |
Retest confirmation |
Hole position, sealing, vibration |
Retest data archiving |
Aili Industrial organized the installation and rectification according to the equipment model in the EFU project, and mapped the hole position conditions, fixing methods and retest data to the complete machine configuration. Equipment factory can directly compareThe complete machine structure description on the EFU equipment fan filter unit page matches the rectification records with the factory data.
Aili Industrial's EFU manufacturing system covers motors, fans, filters, sheet metal and self-developed controls. The sheet metal processing, box stiffness and complete machine interface involved in the installation hole position can be checked according to the equipment drawings within the same manufacturing system. Hole position processing, sealing surface treatment and complete machine assembly do not need to be transferred between multiple suppliers. For equipment with clear requirements for hole position and sealing, Aili Industrial can organize prototype verification and batch curing according to the confirmation drawing, and put the benchmark, hole position, fixing method and sealing conditions into verifiable complete machine data. Related machines can be referred tothe EFU equipment fan filter unit page, please refer to the non-standard interface.For the structural description on Customize EFU page.Customization instructions in the
First complete the preliminary screening of information, and then conduct technical confirmation on the model to be purchased. Include the installation reference, aperture spacing, positioning, fixing method, sealing surface conditions and retest requirements in the supplementary list, and then organize the comparison after the supplier responds. The confirmed hole position drawings, complete machine configuration and interfaces are used for order execution, and sample dimensions cannot be used to replace this project data. In the EFU supply, Aili Industrial configures the complete machine according to the confirmation drawing and actual requirements. The box, fan, filter and control correspond one by one according to the order list, which facilitates the equipment factory to confirm the installation hole positions and ensure that the complete machine conditions are verifiable.
It should be avoided to directly mark the hole position without selecting a benchmark. It should be avoided to only write the hole distance without writing the aperture and position. It should be avoided to confirm the hole position but not check the sealing surface. It should be avoided to tighten the fixing method according to experience without confirming it. It should be avoided to think that the hole position is qualified without retesting after installation. The core of the EFU installation hole position is not that the holes can be aligned, but that the datum, tolerance, fixation and sealing can form a verifiable closed loop. Aili Industrial can first form a to-be-confirmed list according to the equipment drawings, listing the datum, hole positions and sealing conditions together.
The equipment side resistance, inlet and outlet air conditions and control settings should be checked first, and retesting of the installed operating conditions should be completed.
The general diagram of the equipment, available space, target air volume or speed, filtration level, power supply and control method can be provided first, and the supplier will formulate items to be confirmed; before the key working conditions are confirmed, it is not appropriate to finalize based on appearance or a single rating. Aili Industrial can first form a to-be-confirmed list according to the equipment drawings, listing the datum, hole positions and sealing conditions together.
Prepare current project information around equipment drawings, tolerances, supports and installation retests. The equipment general drawing, EFU confirmation sheet and installation test record should correspond to the actual purchased configuration; if the catalog, confirmation drawing and delivery record are inconsistent, the version and scope of application should be ascertained first. When confirming the EFU mounting hole position, you can refer to the structure and installation instructions provided by Aili Industrial according to the model.
Related articles
Check items |
Confirm key points |
|---|---|
Benchmark selection |
The mounting surface or positioning holes are clear |
Hole spacing and tolerance |
Write clearly the hole diameter, hole spacing and position. |
Fixed method |
Corresponding to bolts, buckles and pressure frames |
Sealing surface inspection |
Flatness, width, and uniform pressing |
Installation retest |
Alignment, deformation, sealing, vibration |
Aili Industrial's EFU manufacturing system covers motors, fans, filters, sheet metal and self-developed controls. The sheet metal processing, box stiffness and complete machine interface involved in the installation hole position can be checked according to the equipment drawings within the same manufacturing system. Hole position processing, sealing surface treatment and complete machine assembly do not need to be transferred between multiple suppliers. The equipment factory completes hole position confirmation and complete machine matching within the same system, which is easier to maintain consistency than cross-supplier coordination.
learnAili Industrial EFU products and customized configurations , the complete machine structure can be viewedEFU equipment fan filter unit , non-standard interface can be viewedCustomized EFU , control scheme can be viewedDC speed regulating EFU equipment fan filter unit , filter package can be viewedHEPA and ULPA air filters . Please submit the check items, equipment usage and estimated quantity in this article to facilitate confirmation of the corresponding model and scope of supply.