product

Product Category

loading

Ceiling air conditioning box

Aili industrial ceiling-mounted air-conditioning box adopts a hoisting structure, and the upper space of the building can be used to arrange air treatment equipment. Functional units are configured based on the designed air volume, static pressure, filtration requirements and cold and heat source conditions, and hoisting load-bearing, vibration reduction, filter replacement and condensate discharge are simultaneously considered. It is suitable for industrial plants and clean room supporting projects.
Status:
Quantity:

Ceiling air conditioning box

Use the upper space to arrange equipment, and consider the air supply, filtration and installation and maintenance conditions together.

Aili industrial ceiling-mounted air conditioning box, also known as ceiling-mounted air handling unit and ceiling-mounted wind cabinet, is an air treatment equipment suitable for ceiling-mounted layout. Filters, fans, cooling coils, heating and other functional units can be configured according to project needs to process fresh air, return air or mixed air and deliver it to the service area through air ducts.

Ceiling installation can reduce the equipment's occupation of floor space, but it is necessary to check the building load-bearing, ceiling clearance, air duct direction, condensate discharge and maintenance conditions in advance. Aili Industrial combines the R&D and manufacturing capabilities of fans, motors, filters, sheet metal and control systems to jointly confirm product performance and on-site interfaces to provide support for project selection and non-standard customization.

→ Utilize the upper space of the building → Simultaneous planning of hoisting and maintenance
→ Matching of fan filter configuration → Customization of size and interface is supported

AILIGY Ceiling-Suspended-Air-Handling-Unit_AILIGY Industrial ceiling-mounted air-conditioning box.jpg

What conditions need to be confirmed in advance for suspended ceiling installation?

Follow projects

Selection and installation requirements

Ceiling clearance

At the same time, check the space required for the box, hanger, vibration damping components, insulation and pipelines.

Load-bearing and lifting points

Determine the lifting plan based on the operating weight, structure and building conditions of the equipment

Inspection space

Reserved operating positions for panel opening, filter extraction and fan maintenance

Condensate drain

Determine the plan based on unit pressure conditions, drainage pipelines and water seal requirements

Duct connection

Check the interface location, connection space and independent support conditions of the air duct

Vibration and Noise

Combined with the fan working point, vibration reduction and air duct connection method, the processing is carried out

Product features of Aili Industrial Ceiling Air Conditioning Box

Cabinet height and performance match together

Ceiling-mounted equipment requires consideration of height, air volume, internal resistance and component maintenance space. Aili Industrial can adjust the box length, width, height and component layout based on the installation conditions, and evaluate the structural plan while meeting the selection requirements.

Coordinated selection of fans and motors

Aili Industrial has motor manufacturing and independent fan R&D and production capabilities. It can match the fan working point according to the target air volume, external static pressure, filter and coil resistance, and determine the speed adjustment method based on the operating time and adjustment requirements.

For projects where the ceiling space is close to the use area, the fan operation, vibration reduction and noise reduction configuration can also be evaluated simultaneously, and the specific noise indicators are confirmed according to the agreed working conditions.

Filter replacement method arranged in advance

Relying on its air filter manufacturing capabilities, Aili Industrial can check the filtration grade, size, resistance, sealing and extraction direction with the overall machine structure.

Depending on the site conditions, the side or bottom maintenance plan can be communicated, and the location and size of the building maintenance opening can be confirmed simultaneously to facilitate subsequent filter replacement.

Sheet metal and complete machine assembly cooperate with on-site interface

Aili Industrial has sheet metal processing and complete machine assembly capabilities. It can communicate the box size, air outlet interface, maintenance side and electrical control position according to the lifting direction, air duct direction and pipeline location.

For the transformation of the original system, on-site photos and installation drawings can be combined to evaluate interface adjustments to reduce structural modifications after the equipment arrives on site.

Confirmation of hot and cold treatment and drainage matching

When cooling or heating is required, the corresponding configuration is calculated based on the air inlet and outlet conditions and the conditions of the cold and heat sources. For models using cooling coils, the water tray, drain outlet, necessary water sealing and insulation requirements should be determined simultaneously, taking into account the construction and maintenance conditions in the suspended ceiling.

Control functions configured by project

Aili Industrial has the ability to develop control system software and hardware, and can communicate start and stop, speed adjustment, temperature adjustment, filter pressure difference prompts and external equipment linkage according to needs. The specific functions and communication interfaces are specified in the technical plan.

Product parameters and optional configurations

Parameter items

Configuration instructions

Parameter items

Configuration instructions

Structural form

Ceiling type/suspended type

air source

Fresh air, return air or mixed air

Design air volume

Determined according to project air supply needs

External static pressure

Determine based on external air path resistance

Cabinet size

Determine based on headroom and component layout

Lifting points and weight

Provided based on confirmed structure and operating weight

Filter configuration

Select according to system requirements

Hot and cold treatment

Calculated according to air conditions and cold and heat sources

Fans and motors

Match according to working point and speed regulation requirements

Maintenance method

Determine according to maintenance space

Drainage configuration

Determine according to condensate water and unit pressure conditions

Materials and insulation

Select according to environment and operation requirements

Air duct interface

Determine according to site direction and size

Control method

Configuration by operating mode and system interface

Specific air volume, power, cooling heat, weight, noise and size are subject to the confirmed selection information.

Why choose Aili Industry?

The core components cooperate with the whole machine. The manufacturing system covers motors, fans, filters, control systems, sheet metal and complete machine assemblies. The air volume, static pressure, filter resistance, box structure and control requirements can be confirmed in the same plan.

Supports customization for on-site conditions. Based on the different requirements for ceiling clearance, air duct position, connecting side and maintenance direction, the product structure and interface scheme can be evaluated based on the drawings.

Cooperate with project batch delivery. Relying on the R&D and manufacturing collaboration between Suzhou and Guangde, components, processing, assembly and testing can be organized around the confirmed plan. Multiple equipment projects can uniformly check the configuration, hanging points and interface directions to facilitate installation, maintenance and management.

Clean equipment is provided. When used in clean room systems, it can be used with Aili Industrial'sFFU fan filter unit、HEPA/ULPA air filters andThe high-efficiency air supply outlet simultaneously checks the filter division and air supply parameters.

Applicable scenarios

Application scenarios

main focus

Industrial plants and production auxiliary areas

Use the upper space to arrange filtration, cold and heat treatment and air supply equipment

Electronics and precision manufacturing area

Air volume, filter configuration, vibration and maintenance conditions

Clean room supporting system

Coordinate selection with terminal filter air supply equipment

Laboratory and testing areas

New return air treatment, temperature requirements and control linkage

Renovation of existing systems

Original lifting conditions, clearance, air ducts and drainage connections

FAQ

What is the difference between ceiling-mounted air conditioning boxes and horizontal air conditioning boxes?

The ceiling type focuses on the hoisting structure, connection parts, vibration reduction and maintenance arrangements. Some ceiling-mounted units are also arranged horizontally, but ordinary floor-standing horizontal equipment cannot be directly changed to hoisting without structural confirmation.

The ceiling height is limited, can the air conditioning box be made thin?

The low-height solution can be evaluated based on the air volume and configuration, but it is necessary to check the internal wind speed, resistance, coil size and maintenance space at the same time, and cannot only compress the box height.

Will the suspended ceiling need to be removed for subsequent maintenance?

Depends on the maintenance plan. The access panel, filter extraction direction and building access opening should be determined in advance during design, and space for component maintenance should be reserved.

Why should condensation water be designed in advance?

The drainage space in the suspended ceiling is limited, and the unit pressure may also affect drainage. The plan should be determined based on the water tray, drainage slope, necessary water seal and insulation conditions, and the drainage situation should be checked during commissioning.

Can Aili Industrial customize it according to the existing ceiling space?

You can submit headroom dimensions, air duct diagrams, target air volume static pressure, cold and heat source conditions and maintenance requirements, and evaluate the cabinet, hanging points, interfaces and functional configurations. Building load-bearing and hoisting support must be confirmed by relevant project professionals.

Ceiling air conditioning box selection and technical consultation

The ceiling-mounted air-conditioning box needs to be matched with the building space, hoisting structure, air duct, drainage and control system. Clarifying the air volume, static pressure, headroom, cold and heat sources, and maintenance conditions will help reduce installation adjustments.

Contact Aili Industrial immediately to obtain product information and selection support for ceiling-mounted air-conditioning boxes.

→ Submit ceiling clearance and installation drawings → Consult air volume, static pressure and filtration configuration
→ Communicate on maintenance direction and drainage interface → Understand non-standard customization and batch matching

Aili Industry - From motors, fans and filters to sheet metal, control and complete machine assembly, it provides collaborative manufacturing and technical support for ceiling-mounted air treatment equipment.

Previous article: 
Next article: 
Aili Industrial develops and manufactures FFU, EFU, HEPA/ULPA air filters, high-efficiency air supply vents, fan boxes and other clean air equipment. Relying on motors, fans, control systems, filters and complete machine supporting capabilities, we provide selection and customization support for clean room and production equipment projects.

product

Quick links

Join a global perspective

Get the latest industry white papers and technology updates.
© Suzhou Aili Industrial Co., Ltd. All rights reserved.