Number of views: 5653 Author: Aili Industry Release time: 2027-02-08 Source: Ai Li Industrial
How to customize the special air outlet EFU? The starting point is not to draw the shape of the air outlet first. The direction, location, size and internal flow guide structure of the air outlet will change the air flow path, air outlet uniformity and system resistance. To customize a special air outlet EFU, you must first freeze the equipment boundaries and acceptance conditions, then decide the direction, location, size, diversion structure and connection method of the air outlet, and then confirm the airflow organization and overall machine performance through prototype verification. Make the appearance first and then add the performance. After installing the prototype, you will find that the air outlet direction is biased or the wind speed is uneven, making modifications more expensive. Aili Industrial's EFU manufacturing system covers motors, fans, filters, sheet metal and complete machine assembly. The structure, airflow and complete machine performance of special air outlet EFUs can be checked according to equipment drawings in the same manufacturing system. There is no need to transfer parameters back and forth between the sheet metal factory, fan factory and complete machine factory. This is why many equipment manufacturers will refer to the structural plan description of Aili Industrial when customizing special air outlet EFUs.
The first step in customizing a special air outlet EFU is to freeze the equipment drawings and air outlet requirements. The direction in which the air outlet faces, which side of the EFU it is on, the distance from the protected area, and whether there is any structural obstruction around it, must be confirmed before design. The direction of the air outlet does not match the air flow path inside the equipment, and the air supply cannot cover the target area; the position of the air outlet is blocked by the structure, and the effective air supply volume decreases. The drawings are not frozen, the air outlet is changed again and again, and the subsequent performance matching and prototype verification have to be reworked.
drawing item |
What should be frozen |
FAQ |
|---|---|---|
Wind direction |
Towards which area of the device |
Direction conflicts with airflow path |
Air outlet location |
On which side and how far from the edge? |
Positional and structural interference |
Air outlet size |
Length, width or diameter |
Dimensions do not match protective field |
surrounding structure |
Are there any obstructions or moving parts? |
The wind is blocked |
Ai Li industrialEFU products and customized configurations list the overall dimensions and installation interfaces by model. When the equipment factory freezes the direction of the air outlet, it can directly correspond to the specific model, and the air outlet requirements and the equipment general drawing are put on the same picture for verification. For the relationship between the wind direction and the protection area, please refer toWhat should we pay attention to in the direction of EFU air outlet? structural, electrical, commissioning and rectification points .Checking methods in
Special air outlets change airflow paths and system resistance. The direction of the air outlet changes, the airflow steering angle changes, and the internal resistance increases; the size of the air outlet decreases, the air outlet speed increases, and the resistance increases; the air outlet is added with a diversion structure, and the airflow distribution improves but the resistance may change. When customizing, check the target air volume, external static pressure, air outlet speed and input power according to the complete machine test data of the special air outlet instead of using the data of the standard air outlet.
Performance items |
What should be confirmed |
Impact on special air outlets |
|---|---|---|
Target air volume |
The actual air supply volume required by the equipment |
Changes in the air outlet affect the air volume |
External static pressure |
Equipment internal air duct and air outlet resistance |
The air outlet structure affects resistance |
Wind speed |
Average wind speed at the air outlet |
Size changes affect wind speed |
Input power |
Actual power under target operating conditions |
Changes in resistance affect power |
For the calculation relationship between air volume and resistance, please refer toHow to calculate EFU rated air volume? The method in the air supply area, target wind speed and unit conversion method is to confirm the air volume of the special air outlet under the resistance condition of the whole machine. For a complete calculation method of system resistance, please refer toHow to calculate EFU working static pressure? how to add the resistance of the filter, air inlet and equipment air duct .Explain
The airflow organization of the special air outlet is the focus of customization. After the direction of the air outlet is changed, the distribution of air flow near the air outlet may be uneven; the size of the air outlet changes, and the wind speed distribution may deviate; the design of the diversion structure is unreasonable, and the air flow may drift or vortex. When customizing, confirm the air outlet diversion structure, wind speed distribution requirements and acceptance testing points, and adjust the diversion design through prototype testing if necessary.
airflow term |
What should be confirmed |
Impact on air outlet design |
|---|---|---|
diversion structure |
Does the air outlet have deflectors or flow equalization? |
Affects wind speed distribution |
Wind speed distribution |
Measurement points and deviation requirements on the air outlet surface |
Affect the protective effect |
Wind direction |
Correspondence to protected areas |
Impact coverage |
Eddy current control |
Is there any vortex near the air outlet? |
Affects air flow stability |
Regarding the relationship between wind speed distribution and protection effect, please refer toWhy does the same air volume produce different cleaning and protection effects? In the description, the wind outlet direction, flow guide structure and wind speed distribution are evaluated together. For the calculation method of face wind speed, please refer toHow to calculate EFU surface wind speed? How to determine the effective filtration area and average wind speed .
The interface of the special air outlet includes the connection method and sealing requirements between the air outlet and the equipment structure. Whether the air outlet is flanged, directly connected, or a transition section is added; what is the sealing material and the pressing method; whether sealing is required between the air outlet and the internal structure of the equipment. The interface is not clearly defined, and there may be air leakage or failure to connect after installation. When customizing, the air outlet connection method, sealing material and compression method should be written into the confirmation drawing.
interface item |
What should be confirmed |
FAQ |
|---|---|---|
Connection method |
Flange, butt or transition section |
The connection method is not agreed upon |
Sealing material |
Material, thickness and compression |
Seal material does not match |
Air outlet tolerance |
Dimensional and positional tolerances |
Tolerance not marked |
Installation order |
Assembly sequence with equipment structure |
The order is wrong and cannot be installed. |
Regarding the coordination between the air outlet interface and the device structure, please refer toHow to confirm EFU installation seal? equipment drawings, installation conditions and acceptance methods .Verification methods in
The special air outlet EFU is a new structure and should be prototyped or verified first. The prototype must check assembly interference, air outlet direction, air volume, static pressure, air outlet speed distribution, power, temperature rise, vibration and noise to confirm that the special air outlet does not deviate from the target performance. The prototype data and confirmation drawings are archived together as the basis for inspection of subsequent batches. If you skip the prototype and go directly to batch production, problems will be exposed in the batch stage.
Verification items |
What should be recorded |
What it means for batch size |
|---|---|---|
Assembly inspection |
Air outlet docking, sealing and interference |
Confirm that the structure can be assembled |
Performance testing |
Air volume, static pressure, power, noise |
Confirm that the work point meets the standards |
Wind speed distribution |
Measurement points and deviations on the air outlet surface |
Confirm that airflow organization is feasible |
Temperature rise and vibration |
Continuous operation temperature rise and vibration |
Confirm long-term stable operation |
In the special air outlet EFU project, Aili Industrial organizes the prototype or first unit verification according to the equipment drawings, files the assembly, performance, wind speed distribution and temperature rise data together with the confirmation drawing, and then solidifies the batch configuration. Equipment factories complete prototypes and batches within the same manufacturing system, making it easier to maintain version consistency than cross-supplier coordination. Related machines can be referred tothe EFU equipment fan filter unit page, please refer to the non-standard structure.The structure description on Customize EFU page.Customization instructions in the
After the prototype is approved, the confirmation drawing, bill of materials, control parameters and inspection records must be formed into a fixed version. The drawing version of the special air outlet is particularly important. If the direction, size, and diversion structure of the air outlet change, the previous prototype data may no longer be applicable. Batch execution is based on the same version, and changes must be approved and synchronized to drawings and materials to avoid configuration deviations in subsequent batches.
Cured items |
What should be confirmed |
|---|---|
Drawing version |
The air outlet confirmation drawing is consistent with the processing drawing |
bill of materials |
Box, fan, filter and controller models are fixed |
Inspection items |
The first unit is consistent with the batch inspection items |
Change management |
How to approve changes to the air outlet structure |
For projects involving non-standard interfaces, please refer toHow to customize non-standard EFU? equipment drawings, performance parameters, interfaces and prototype confirmation correspond to changes in air outlet structure and batch configuration.The version management ideas in
Aili Industrial's EFU manufacturing system covers motors, fans, filters, sheet metal and self-developed controls. The structure, airflow and overall machine performance of the special air outlet EFU can be checked according to the equipment drawings within the same manufacturing system. The air outlet processing, diversion design and complete machine assembly do not need to be transferred between multiple suppliers. For special air outlet projects, Aili Industrial can organize prototype verification and batch solidification according to the confirmation drawing, and put the air outlet direction, diversion structure, interface and inspection items into verifiable complete machine data. Related machines can be referred tothe EFU equipment fan filter unit page.Structural description on
First complete the preliminary screening of information, and then conduct technical confirmation on the model to be purchased. Include the direction, location, size, diversion structure, performance parameters, interface definition and prototype verification of the air outlet in the supplementary list. Comparison will be organized after the supplier responds. The confirmed air outlet drawings, complete machine configuration and interfaces are used for order execution. Standard air outlet parameters cannot be used to replace this project data. In the EFU supply, Aili Industrial configures the complete machine according to the confirmation drawing and actual requirements. The box, fan, filter and control correspond one by one according to the order list, which facilitates the equipment factory to customize the special air outlet EFU to the verifiable complete machine conditions.
It should be avoided to first draw the shape of the air outlet and then supplement the performance. It should be avoided to use the air volume and static pressure data of the standard air outlet. It should be avoided to only confirm the air outlet direction but not the wind speed distribution. It should be avoided to install the machine without confirming the interface and seal. It should be avoided to skip the prototype and go directly to batch. The core of EFU customization for special air outlets is not the special shape of the air outlet, but that the air outlet direction, airflow organization, performance parameters and interfaces can form a verifiable closed loop. Aili Industrial can first form a to-be-confirmed list according to the equipment drawings, listing the air outlet, performance and interface conditions together.
For new structure or new interface projects, it is recommended to verify the prototype or the first unit first, and then solidify the batch configuration after confirming the performance and assembly.
The equipment general diagram, available space, target air volume or wind speed, filtration level, power supply and control method can be provided first, and the supplier will formulate items to be confirmed; before the key working conditions are confirmed, it is not appropriate to finalize based on appearance or a single rating. Aili Industrial can first form a to-be-confirmed list according to the equipment drawings, listing the air outlet, performance and interface conditions together.
Prepare current project materials around confirmation diagrams, performance conditions, prototype verification and version solidification. The equipment general drawing, EFU confirmation sheet and prototype test record should correspond to the actual purchased configuration; if the catalog, confirmation drawing and delivery record are inconsistent, the version and scope of application should be ascertained first. When customizing special air outlet EFU, you can refer to the structure and performance supporting instructions provided by Aili Industrial according to the model.
Related articles
Check items |
Confirm key points |
|---|---|
Equipment drawings |
The direction, location and surrounding structure of the air outlet are frozen. |
Performance parameters |
Reconfirm the air volume and resistance under the special air outlet |
airflow organization |
Diversion structure and wind speed distribution design |
Interface definition |
Connection method, sealing material, tolerance |
Prototype verification |
Assembly, performance, wind speed distribution, temperature rise |
Aili Industrial's EFU manufacturing system covers motors, fans, filters, sheet metal and self-developed controls. The structure, airflow and overall machine performance of the special air outlet EFU can be checked according to the equipment drawings within the same manufacturing system. The air outlet processing, diversion design and complete machine assembly do not need to be transferred between multiple suppliers. The equipment factory completes the prototype and batch production of special air outlet EFU within the same system, which is easier to maintain consistency than cross-supplier coordination.
learnAili Industrial EFU products and customized configurations , the complete machine structure can be viewedEFU equipment fan filter unit , non-standard customization can be viewedCustomized EFU , filtering package can be viewedHEPA and ULPA air filters , the control scheme can be viewedDC speed regulating EFU equipment fan filter unit . Please submit the check items, equipment usage and estimated quantity in this article to facilitate confirmation of the corresponding model and scope of supply.