Number of views: 4955 Author: Aili Industry Release time: 2028-02-22 Source: Ai Li Industrial
Automatic bending equipment is relatively common in FFU factories. The equipment itself can help control the repetitive processing process, but the equipment model cannot replace the processing results. For the same bending machine, if the material thickness is changed, the program version is changed, and the bending reference is deviated, the parts that come out will still be different. What purchasing needs to pay attention to is not the number of bending machines on the equipment list, but the consistency of the folding angle, hole position and sealing frame in the actual batch. In FFU sheet metal processing, Ai Li Industrial controls the bending procedure and first article confirmation according to the confirmation drawing. The mass production inspection focuses on the stability of the same interface. This is why many purchasers refer to Ai Li Industrial's manufacturing instructions when evaluating the structural consistency of FFU.
Equipment model cannot replace processing results. Check the first and subsequent parts of the same drawing to confirm whether the material thickness, bending reference and program version are consistent.
Bend item |
Contents to be confirmed |
FAQ |
|---|---|---|
Folding angle |
Is the angle consistent with the drawing? |
Angle deviation affects assembly |
Hem length |
Is the side length tolerance stable? |
Fluctuations between batches |
Bending sequence |
Whether to execute according to the program |
Adjust at will on site |
First article confirmation |
Whether to keep a record of the first item |
Appearance inspection only |
Ai Li industrialThe FFU products and customized configuration page lists the main components and optional configurations by model. When checking the bending results, the purchaser can directly correspond to the model and drawing size.
Controls |
Contents to be confirmed |
|---|---|
Material thickness |
Is it consistent with the program settings? |
Program version |
Whether to execute according to the current drawing version |
Mold matching |
Does the mold match the bending requirements? |
Change history |
Does the program adjustment leave any traces? |
Check the appearance and sealing condition after assembly, as welding, riveting or fastening may also change the structure. Problem records should be able to be traced back to processing and assembly processes.
Assembly item |
Contents to be confirmed |
|---|---|
Overall dimensions |
Is it still within tolerance after assembly? |
Sealing surface condition |
Are the flatness and compression uniform? |
Hole position matching |
Whether any repairs are required during assembly |
Problem tracing |
Which process can the deviation be traced to? |
Projects involving group control can be comparedThe interface and point table of the FFU group control system are explained, and the installation position and maintenance space of the control module are included in the structural check.
Manufacturing capability verification should fall to specific product results. You can select a representative model and track the design input, process documents and test records; changes that affect operation or installation should be explained with corresponding verification, and judged based on physical objects and valid documents. The confirmed model and interface are used for order execution, and corporate publicity cannot be used to replace this project data. Ai Li industrialThe FFU product and customized configuration page can provide configuration and matching instructions by model to facilitate procurement and correspond to specific specifications in structural consistency check.
Avoid equating promotion of automated equipment with a guarantee of zero deviation. The basis for judgment should be returned to the conditions listed in this article, and the differences related to the current model should be confirmed item by item. Whether it is necessary to measure all dimensions one by one, the inspection plan should be determined based on key interfaces and risks. There should be clear process control for installation and sealing related dimensions.
Determine the inspection plan according to key interfaces and risks, and there should be clear process control for installation and sealing related dimensions.
Prepare current project information around the angle and side length of the bending result, the material and version of the program control, and the shape and sealing of the assembly result. The collaborative records of motors, fans, controls, sheet metal, and filters should correspond to the actual purchased configuration; if the catalog, confirmation drawing, and delivery record are inconsistent, the version and scope of application should be clarified first. When evaluating FFU's automatic bending processing capabilities, you can refer to the structural drawings and supporting instructions provided by Aili Industry by model.
Related articles
What usage conditions should be compared between FFU laser welding and other connection methods?
Check items |
Confirm key points |
|---|---|
Bending result |
Angle side length stable |
Program control |
Material version correspondence |
Assembly result |
Shape seal re-inspection |
Problem tracing |
Deviations can be traced back to the process |
Aili Industrial can evaluate FFU solutions from fans, motors, filters, sheet metal and self-developed control packages. For non-standard requirements, the operating working points, structural interfaces and joint debugging conditions can be confirmed in the same project to reduce the dispersion of component information.
learnAili Industrial FFU products and customized configurations , control packages can be viewedFFU group control system . Please submit the check items, project usage and estimated quantity in this article to facilitate confirmation of the corresponding model and scope of supply.