front page » FAQ and technical support » Clean equipment FAQ and technical support » FFU FAQs and Selection Guide » FFU project budget, technical agreement and delivery » How does the FFU purchase contract stipulate the supply responsibility for the complete machine, filter element and control system?

How does the FFU purchase contract stipulate the supply responsibility for the complete machine, filter element and control system?

Number of views: 2022     Author: Aili Industry Release time: 2028-07-19 Source: Ai Li Industrial

Inquiry

['ols, start-stop contacts, and fault outputs. The signal table should write down the target signal type, control range, terminal definition and disconnection processing. Adding the air duct flange, power supply capacity, control point table and available maintenance space to the inquiry information can help form an executable plan faster. Aili Industrial can discuss DC fan chassis configuration in combination with motors, fans, drives and cabinet interfaces.

How does the FFU purchase contract stipulate the supply responsibility for the complete machine, filter element and control system?

In the FFU purchase contract, the scope of supply often only contains the sentence 'number of FFU units'. This way of writing seems sufficient at a single point in time, but FFU actually includes several parts: the complete machine, filter element, and control system. Who provides each part, who is responsible for matching, and who provides testing data. If it is not written clearly, it is easy to have unclear responsibility interface when a problem occurs. Whether the filter element is assembled with the complete machine, whether the control includes gateways and software, and who provides the wires should all be specified in the contract. In the FFU project, Aili Industry lists the scope of supply according to three parts: complete machine, filter element and control. The configuration, installation and testing data of each part correspond to each other one by one, which facilitates procurement to write the supporting interface responsibilities into the contract. This is why many purchasers will refer to Aili Industry's supply instructions when preparing FFU purchase contracts.

Responsibility for the entire machine: structure and operation should be clear

Whether the filter element is assembled with the whole machine, whether the control includes gateway and software, and who provides the wires should be clearly stated in the list and cannot be explained by the product name.

Complete machine item

Contents to be confirmed

FAQ

Structure and size

Model, appearance, installation interface

Just write the series name

Running performance

Air volume, static pressure, power and test conditions

Performance conditions are not written

Install accessories

Flanges, seals, mounting parts

Attachment range unclear

random files

Inspection records, certificates, drawings

File range not listed

Ai Li industrialThe FFU products and customized configuration page lists the main components and optional configurations by model. When purchasing, you can directly quote the model and component fields when agreeing on the responsibility for the complete machine.

Filter element responsibility: configuration and installation should correspond

Filter item

Contents to be confirmed

Configuration scope

Grade, size, quantity

Installation Responsibility

Who installs and checks seals?

Testing data

Who provides the Efficiency and Resistance Report?

Replacement and spare parts

Spare parts list and supply method

Control responsibilities: interfaces and joint debugging must be clearly written

Controls

Contents to be confirmed

control module

Controller, gateway, operation interface

Wire range

Type, length, by whom

Joint debugging responsibility

Division of labor between stand-alone testing and system testing

Document delivery

Point table, protocol, operating instructions

When supporting different units, confirm the data transfer, joint debugging and problem coordination methods, and keep separate records for single machine delivery and on-site system inspection. Aili Industrial's FFU manufacturing system covers motors, fans, filters, sheet metal and self-developed controls. The complete machine, filter elements and controls can be coordinated and configured in the same project. The scope of responsibility can be specified item by item in the contract corresponding to the specific model. Projects involving group control can be comparedThe interface and point table of the FFU group control system are described, and the address planning, protocol version and joint debugging boundary are written into the control responsibility.

How to form executable confirmation results

Technical accessories and supply list need to be consistent. Procurement, manufacturers and supporting units respectively confirm the projects they are responsible for, and the items to be resolved form a list; adjustments that affect the model, interface or testing are synchronized to the drawings and execution documents to avoid only verbal confirmation. Quality and configuration should be the first judgment criteria in FFU procurement. During supply, Aili Industry configures and supplies products according to the actual requirements of the project. The complete machine, filter element and control correspond to each item in the order list. Ai Li industrialThe FFU product and customized configuration page can provide configuration and supporting instructions by model to facilitate procurement and correspond to specific specifications in contract terms.

Misunderstandings to avoid

It should be avoided to only write FFU in the same list without explaining the supporting scope. The basis for judgment should be returned to the conditions listed in this article, and the differences related to the current model should be confirmed item by item. When the filter element is provided by the customer, the size, sealing, resistance and test boundaries still need to be checked to ensure that the complete machine is consistent with the customer's supporting components. This part of the responsibility should also be stated in the contract.

Related questions and answers

Does the filter element provided by the customer still need to be confirmed by the manufacturer?

Dimensions, seals, resistance and test boundaries need to be checked to ensure that the complete machine is consistent with the customer's matching parts.

What specific information do I need to prepare for this question?

Prepare current project information around the structure and operation of the complete machine, the configuration and installation of the filter element, and the interface and joint debugging of the control responsibility. Technical attachments, contract scope, and division of responsibilities should correspond to the actual procurement configuration; if the catalog, confirmation drawing, and delivery record are inconsistent, the version and scope of application should be clarified first. When preparing the FFU purchase contract, you can refer to the supply and configuration instructions provided by Aili Industrial by model.

Related articles

How does the FFU bidding document set requirements for manufacturer qualifications and product capabilities?

What items need to be clarified in FFU procurement that are not included? Avoid missing packages

Key points for selection and acceptance inspection

Check items

Confirm key points

Overall machine responsibility

Structural operation attachments are clear

Filter element responsibility

Configure installation detection corresponding

control responsibility

Interface joint debugging and writing

File consistent

Technical attachments are consistent with the listing

Aili Industrial FFU selection and procurement support

The Aili Industrial FFU project can combine the complete machine configuration, filters, controls and sheet metal interfaces to form technical confirmation data. The procurement and installation units will check the drawings and joint debugging conditions according to the specific scope of supply, and arrange product inspection and system acceptance separately.

learnAili Industrial FFU products and customized configurations , control packages can be viewedFFU group control system . Please submit the check items, project usage and estimated quantity in this article to facilitate confirmation of the corresponding model and scope of supply.

Aili Industrial develops and manufactures FFU, EFU, HEPA/ULPA air filters, high-efficiency air supply vents, fan boxes and other clean air equipment. Relying on motors, fans, control systems, filters and complete machine supporting capabilities, we provide selection and customization support for clean room and production equipment projects.

product

Quick links

Join a global perspective

Get the latest industry white papers and technology updates.
© Suzhou Aili Industrial Co., Ltd. All rights reserved.