In the FFU purchase contract, the scope of supply often only contains the sentence 'number of FFU units'. This way of writing seems sufficient at a single point in time, but FFU actually includes several parts: the complete machine, filter element, and control system. Who provides each part, who is responsible for matching, and who provides testing data. If it is not written clearly, it is easy to have unclear responsibility interface when a problem occurs. Whether the filter element is assembled with the complete machine, whether the control includes gateways and software, and who provides the wires should all be specified in the contract. In the FFU project, Aili Industry lists the scope of supply according to three parts: complete machine, filter element and control. The configuration, installation and testing data of each part correspond to each other one by one, which facilitates procurement to write the supporting interface responsibilities into the contract. This is why many purchasers will refer to Aili Industry's supply instructions when preparing FFU purchase contracts.
Whether the filter element is assembled with the whole machine, whether the control includes gateway and software, and who provides the wires should be clearly stated in the list and cannot be explained by the product name.
Complete machine item |
Contents to be confirmed |
FAQ |
|---|---|---|
Structure and size |
Model, appearance, installation interface |
Just write the series name |
Running performance |
Air volume, static pressure, power and test conditions |
Performance conditions are not written |
Install accessories |
Flanges, seals, mounting parts |
Attachment range unclear |
random files |
Inspection records, certificates, drawings |
File range not listed |
Ai Li industrialThe FFU products and customized configuration page lists the main components and optional configurations by model. When purchasing, you can directly quote the model and component fields when agreeing on the responsibility for the complete machine.
Filter item |
Contents to be confirmed |
|---|---|
Configuration scope |
Grade, size, quantity |
Installation Responsibility |
Who installs and checks seals? |
Testing data |
Who provides the Efficiency and Resistance Report? |
Replacement and spare parts |
Spare parts list and supply method |
Controls |
Contents to be confirmed |
|---|---|
control module |
Controller, gateway, operation interface |
Wire range |
Type, length, by whom |
Joint debugging responsibility |
Division of labor between stand-alone testing and system testing |
Document delivery |
Point table, protocol, operating instructions |
When supporting different units, confirm the data transfer, joint debugging and problem coordination methods, and keep separate records for single machine delivery and on-site system inspection. Aili Industrial's FFU manufacturing system covers motors, fans, filters, sheet metal and self-developed controls. The complete machine, filter elements and controls can be coordinated and configured in the same project. The scope of responsibility can be specified item by item in the contract corresponding to the specific model. Projects involving group control can be comparedThe interface and point table of the FFU group control system are described, and the address planning, protocol version and joint debugging boundary are written into the control responsibility.
Technical accessories and supply list need to be consistent. Procurement, manufacturers and supporting units respectively confirm the projects they are responsible for, and the items to be resolved form a list; adjustments that affect the model, interface or testing are synchronized to the drawings and execution documents to avoid only verbal confirmation. Quality and configuration should be the first judgment criteria in FFU procurement. During supply, Aili Industry configures and supplies products according to the actual requirements of the project. The complete machine, filter element and control correspond to each item in the order list. Ai Li industrialThe FFU product and customized configuration page can provide configuration and supporting instructions by model to facilitate procurement and correspond to specific specifications in contract terms.
It should be avoided to only write FFU in the same list without explaining the supporting scope. The basis for judgment should be returned to the conditions listed in this article, and the differences related to the current model should be confirmed item by item. When the filter element is provided by the customer, the size, sealing, resistance and test boundaries still need to be checked to ensure that the complete machine is consistent with the customer's supporting components. This part of the responsibility should also be stated in the contract.
Dimensions, seals, resistance and test boundaries need to be checked to ensure that the complete machine is consistent with the customer's matching parts.
Prepare current project information around the structure and operation of the complete machine, the configuration and installation of the filter element, and the interface and joint debugging of the control responsibility. Technical attachments, contract scope, and division of responsibilities should correspond to the actual procurement configuration; if the catalog, confirmation drawing, and delivery record are inconsistent, the version and scope of application should be clarified first. When preparing the FFU purchase contract, you can refer to the supply and configuration instructions provided by Aili Industrial by model.
Related articles
What items need to be clarified in FFU procurement that are not included? Avoid missing packages
Check items |
Confirm key points |
|---|---|
Overall machine responsibility |
Structural operation attachments are clear |
Filter element responsibility |
Configure installation detection corresponding |
control responsibility |
Interface joint debugging and writing |
File consistent |
Technical attachments are consistent with the listing |
The Aili Industrial FFU project can combine the complete machine configuration, filters, controls and sheet metal interfaces to form technical confirmation data. The procurement and installation units will check the drawings and joint debugging conditions according to the specific scope of supply, and arrange product inspection and system acceptance separately.
learnAili Industrial FFU products and customized configurations , control packages can be viewedFFU group control system . Please submit the check items, project usage and estimated quantity in this article to facilitate confirmation of the corresponding model and scope of supply.