During FFU tender review, it is a common requirement for suppliers to submit deviation forms. However, many deviation tables mix technology and business. For example, one record contains both 'filter element level adjusted to H13' and 'price reduced by 3%'. During the review, technical staff only focus on performance, and business staff only focus on cost. Deviations in mixed writing can easily be missed or repeated communication. A reasonable approach is to record technical deviations and business deviations separately. Technical items correspond to working conditions, structure and control, and business items correspond to costs, delivery and service scope. The two types of deviations are reviewed and confirmed separately, and finally a unified conclusion is formed. In the FFU project, Aili Industry configures and supplies products according to the confirmed drawings and actual requirements. The technical conditions and business conditions are explained separately. The deviation items can be mapped to the specific models and scope of supply one by one. This is why many procurements refer to the Aili Industrial bidding materials when preparing the FFU deviation table.
Quote the original requirements and supplier responses item by item to explain the reasons and impacts of the deviation. Total price discounts cannot be used to offset unreviewed technical deficiencies.
Technical items |
Contents to be confirmed |
FAQ |
|---|---|---|
Working conditions |
Air volume, static pressure, filter element configuration |
Only write satisfaction, no data |
structure |
Dimensions, materials, sealing |
Deviation not stated |
control |
Protocol, point table, alarm |
Protocol inconsistency not listed |
test |
Items and conditions |
Test scope narrowed |
Ai Li industrialThe FFU product and customized configuration page lists the main components and optional configurations by model. The reviewer can compare the supplier's response accordingly and map the technical deviation to the specific model and component.
Business items |
Contents to be confirmed |
|---|---|
cost |
Unit price, total price, inclusion range |
Delivery date |
Delivery nodes and batch arrangements |
Serve |
Transportation, guidance, debugging, verification |
Payment |
Prepayment ratio and node file |
status item |
Contents to be confirmed |
|---|---|
accept |
Acceptable after review |
To be verified |
Need additional information or review |
Not accepted |
beyond the allowed range |
alternative |
Whether to submit additional equivalence instructions |
After confirming the acceptable deviation, the drawings, configurations and quotations will be updated simultaneously, and unresolved items will remain in the status of pending confirmation to avoid the use of conflicting documents in the final order. In the FFU project, Aili Industry configured and supplied goods according to the confirmed drawings and actual requirements. The technical conditions and business conditions were respectively mapped to the order list. After the deviation items were updated, they were synchronized to the drawings and configuration records. Projects involving group control can be comparedThe interface and point table description of the FFU group control system includes the protocol, point table and joint debugging scope in the technical deviation check.
Technical accessories and supply list need to be consistent. Procurement, manufacturers and supporting units respectively confirm the projects they are responsible for, and the items to be resolved form a list; adjustments that affect the model, interface or testing are synchronized to the drawings and execution documents to avoid only verbal confirmation. Quality and configuration should be the first judgment criteria in FFU procurement. Aili Industry will configure and supply products according to the actual requirements of the project in the bidding response. Ai Li industrialThe FFU product and customized configuration page can provide configuration and supporting instructions by model to facilitate the reviewer to correspond to specific specifications in the deviation review.
It should be avoided that mixing technical and business differences will lead to missed review of key items. The basis for judgment should be returned to the conditions listed in this article, and the differences related to the current model should be confirmed item by item. Deviations do not necessarily mean failure, and should be evaluated according to the importance of the requirements. Equivalent or adjustment plans can be reviewed and confirmed according to the project process, but they must be recorded and reviewed separately.
Not necessarily, it should be evaluated according to the importance of the requirements, and equivalent or adjusted plans can be reviewed and confirmed according to the project process.
Prepare current project information around the working condition structure control of technical deviations, cost and delivery services of commercial deviations, acceptance and verification of confirmation status. Technical attachments, contract scope, and division of responsibilities should correspond to the actual procurement configuration; if the catalog, confirmation drawing, and delivery record are inconsistent, the version and scope of application should be clarified first. When preparing the FFU deviation table, you can refer to the configuration and response instructions provided by Aili Industry by model.
Related articles
Alternatives to FFU manufacturers' bidding, how does procurement organize technical reviews?
Can FFU tender only specify the motor brand? How to describe equivalent technical conditions
Check items |
Confirm key points |
|---|---|
technical deviation |
Separate working condition structure control |
business deviation |
Breakdown of cost and delivery services |
Confirm status |
Accept pending verificationDo not accept |
Update synchronization |
Drawing configuration quotation consistent |
The Aili Industrial FFU project can combine the complete machine configuration, filters, controls and sheet metal interfaces to form technical confirmation data. The procurement and installation units will check the drawings and joint debugging conditions according to the specific scope of supply, and arrange product inspection and system acceptance separately.
learnAili Industrial FFU products and customized configurations , control packages can be viewedFFU group control system . Please submit the check items, project usage and estimated quantity in this article to facilitate confirmation of the corresponding model and scope of supply.