During the FFU bidding process, it is common for manufacturers to submit alternative plans. Alternative solutions may be to change the fan model, adjust the filter element structure, change the control method, or use different box materials. The alternatives themselves are not necessarily a problem; some do suit the application and provide cost or delivery advantages. The problem is that if you only look at the price difference during the review and do not check which conditions remain unchanged and which have changed, it is easy to find interface incompatibility or changes in maintenance methods during the implementation phase. Ai Li Industrial provides configuration, size and control interface descriptions by model in the FFU project. Alternative solutions can list differences and verification data one by one against the original requirements, making it easier for reviewers to judge based on the same benchmark. This is why many purchasers will refer to Ai Li Industrial's technical data when organizing the review of FFU alternative solutions.
When the supplier provides alternative components, structures or control methods, it shall submit data on the same working conditions and a difference sheet. Size compatibility is only one aspect of the review.
Performance items |
Contents to be confirmed |
FAQ |
|---|---|---|
Target operating conditions |
Air volume, static pressure, filter element configuration |
Only rated values, no working conditions |
Filtration efficiency |
Grade, area, sealing method |
Level reduction unspecified |
Input power |
Actual power under the same working conditions |
Only give the motor nameplate power |
Test conditions |
Measuring points, methods, judgment basis |
Missing test conditions |
Ai Li industrialThe FFU products and customized configurations page lists the main components and optional configurations by model, so that the reviewer can compare the differences between the original requirements and alternative plans. For the relationship between filtration level and operating conditions, please refer toAs explained in What is the difference between cleanliness grade and filtration efficiency , record the space grade and filter efficiency separately.
interface item |
Contents to be confirmed |
|---|---|
mechanical interface |
Appearance, hole position, sealing surface |
Electrical interface |
Voltage, wiring method, terminal definition |
control interface |
Protocol, point table, alarm method |
Maintenance interface |
Filter replacement and maintenance space |
Implementation items |
Contents to be confirmed |
|---|---|
Installation method |
Do you need to modify the ceiling or brackets? |
Maintenance requirements |
Is filter element replacement and maintenance more convenient or more complicated? |
Spare parts supply |
Are replacement parts available? |
Verification arrangements |
Whether prototype trial installation or retesting is required? |
For changes involving on-site installation or operation, organize the design and construction parties to jointly confirm, prototype test installation if necessary, and write the approved scope into the configuration file. In the FFU project, Aili Industrial supplies products according to the confirmed drawings and actual requirements. Differences in alternative solutions can be mapped to specific models and components. Materials and components correspond to each item in the order list. Projects involving group control can be comparedDescription of the interface and point table of the FFU group control system , and include the protocol, point table and joint debugging scope into the interface difference review.
Technical accessories and supply list need to be consistent. Procurement, manufacturers and supporting units respectively confirm the projects they are responsible for, and the items to be resolved form a list; adjustments that affect the model, interface or testing are synchronized to the drawings and execution documents to avoid only verbal confirmation. Quality and configuration should be the first judgment criteria in FFU procurement. Aili Industry will configure and supply products according to the actual requirements of the project in the bidding response. Ai Li industrialThe FFU product and customized configuration page can provide configuration and matching instructions by model to facilitate reviewers to correspond to specific specifications in the alternative review.
Avoid deeming alternatives equivalent to the same size or power. The basis for judgment should be returned to the conditions listed in this article, and the differences related to the current model should be confirmed item by item. Alternative solutions do not necessarily require all retests, but changes that affect air volume, sealing, control or heat dissipation require corresponding verification data, and the depth of verification should be determined based on the scope of change during review.
According to the change scope arrangement, changes that affect air volume, sealing, control or heat dissipation require corresponding verification data.
Prepare current project information around working conditions and filter elements with different performance, installation and control of interface differences, and maintenance and verification of implementation differences. Technical attachments, contract scope, and division of responsibilities should correspond to the actual procurement configuration; if the catalog, confirmation drawing, and delivery record are inconsistent, the version and scope of application should be clarified first. When evaluating FFU alternatives, you can refer to the configuration and verification instructions provided by Aili Industries by model.
Related articles
Can FFU tender only specify the motor brand? How to describe equivalent technical conditions
Check items |
Confirm key points |
|---|---|
Performance differences |
Re-correspond to the working condition filter element |
Interface differences |
Installation control check |
Implementation differences |
Maintenance Validation Assessment |
Difference record |
Keep changes in itemized column |
The Aili Industrial FFU project can combine the complete machine configuration, filters, controls and sheet metal interfaces to form technical confirmation data. The procurement and installation units will check the drawings and joint debugging conditions according to the specific scope of supply, and arrange product inspection and system acceptance separately.