How does FFU project bidding require suppliers to submit a model configuration list?

In the FFU project bidding, if the supplier is only required to submit a series name and total price, it will be difficult to judge whether the configurations of each supplier are consistent during the review. The same series may correspond to different fans, different filter elements, different materials and different control methods. The quotations are not comparable when put together. A reasonable approach is to provide a unified model configuration list template in the bidding document, requiring suppliers to fill in specific components and interface conditions item by area, quantity, and model, and assign the series name to a unique configuration. Ai Li Industrial provides configuration, size and control interface descriptions by model in the FFU project. The configuration list can correspond to the confirmation drawings and inspection data item by item, making it easier for the bidder to check and respond in a unified format. This is why many purchasers will refer to Ai Li Industrial product information when preparing the FFU bidding configuration table.

Regional correspondence: The location and quantity must be filled in item by item.

Use a unified form to allow suppliers to fill in the configuration of each model, and indicate replacement parts and optional accessories separately to facilitate horizontal comparison.

area item

Contents to be confirmed

FAQ

floor or area

Location and quantity of each district

Only report a total

Position number

Corresponds to ceiling drawings

The numbering does not match the drawing

control address

Corresponds to the group control point table

The address is not planned

special request

Are there any special working conditions in this area?

Special areas are not listed separately

Ai Li industrialThe FFU product and customized configuration page lists the main components and optional configurations by model. The tenderer can design a configuration list template based on this and map the regions and models item by item.

Model correspondence: Parts and interfaces must be written in detail

Configuration items

Contents to be confirmed

Machine model

Series and specific versions

Fans and motors

Model, power, speed adjustment method

filter element

Grade, size, quantity, sealing method

Box material

Grade, thickness, surface treatment

control module

Protocol, point table, gateway capacity

Install accessories

Flanges, seals, mounting parts

Document correspondence: the list and drawings must be consistent

file item

Contents to be confirmed

Confirmation picture

Drawing version corresponding to configuration list

Testing data

Complete machine test records and certificates

deviation table

Separate technical deviation from business deviation

alternative

Equivalent conditions and verification methods

After the list is finalized, it should be consistent with the confirmation drawing and delivery documents. Subsequent changes will update the affected items without overwriting the order configuration with a new catalog. In the FFU project, Aili Industrial supplies products according to the configuration and actual requirements of the confirmation drawing. The configuration list, confirmation drawing and testing data refer to the same valid version, and materials and components correspond to each other item by item according to the order. Projects involving group control can be comparedThe interface and point table of the FFU group control system are described, and the address planning, protocol version and extended capacity are written into the configuration list.

How to form executable confirmation results

Technical accessories and supply list need to be consistent. Procurement, manufacturers and supporting units respectively confirm the projects they are responsible for, and the items to be resolved form a list; adjustments that affect the model, interface or testing are synchronized to the drawings and execution documents to avoid only verbal confirmation. Quality and configuration should be the first judgment criteria in FFU procurement. In the bidding response, Aili Industry will configure and supply goods according to the actual requirements of the project, and materials and components will correspond item by item according to the order list. Ai Li industrialThe FFU product and customized configuration page can provide configuration and supporting instructions by model to facilitate the tenderer to correspond to specific specifications during the review.

Misunderstandings to avoid

Avoid using product family catalogs in place of project configuration responses. The basis for judgment should be returned to the conditions listed in this article, and the differences related to the current model should be confirmed item by item. A project can use different configurations by area, but the number, quantity and applicable location should be distinguished to prevent on-site mixing.

Related questions and answers

Can a project have multiple configuration versions?

Different configurations can be used by area, but the number, quantity and applicable location should be distinguished to prevent on-site mixing.

What specific information do I need to prepare for this question?

Prepare current project information around the location and quantity corresponding to the area, the components and interfaces corresponding to the model, and the list and drawings corresponding to the files. Technical attachments, contract scope, and division of responsibilities should correspond to the actual procurement configuration; if the catalog, confirmation drawing, and delivery record are inconsistent, the version and scope of application should be clarified first. When preparing the FFU bidding configuration table, you can refer to the configuration and response instructions provided by Aili Industry by model.

Related articles

How does the FFU bidding document set requirements for manufacturer qualifications and product capabilities?

How does the FFU purchase contract stipulate the supply responsibility for the complete machine, filter element and control system?

Key points for selection and acceptance inspection

Check items

Confirm key points

Regional correspondence

Fill in the number of positions item by item

Model correspondence

Write the component interface in detail

File correspondence

List drawings consistent

Change management

Update affected entries

Aili Industrial FFU selection and procurement support

The Aili Industrial FFU project can combine the complete machine configuration, filters, controls and sheet metal interfaces to form technical confirmation data. The procurement and installation units will check the drawings and joint debugging conditions according to the specific scope of supply, and arrange product inspection and system acceptance separately.

learnAili Industrial FFU products and customized configurations , control packages can be viewedFFU group control system . Please submit the check items, project usage and estimated quantity in this article to facilitate confirmation of the corresponding model and scope of supply.

Aili Industrial develops and manufactures FFU, EFU, HEPA/ULPA air filters, high-efficiency air supply vents, fan boxes and other clean air equipment. Relying on motors, fans, control systems, filters and complete machine supporting capabilities, we provide selection and customization support for clean room and production equipment projects.

product

Quick links

Join a global perspective

Get the latest industry white papers and technology updates.
© Suzhou Aili Industrial Co., Ltd. All rights reserved.