Number of views: 2570 Author: Aili Industry Release time: 2028-08-04 Source: Ai Li Industrial
In FFU technical accessories, the electrical interface part is often written relatively simply, such as 'power supply 220V' or 'support group control'. Problems arise when this writing method reaches the on-site installation and joint debugging stage. The wiring personnel do not know which terminal is the main power supply and which is the control power supply, which port the communication line is connected to, and how to derive the alarm signal. If the terminals are not clearly defined, on-site re-confirmation will delay the progress at best, or incorrect connections may cause equipment damage. In the FFU project, Aili Industry lists the power supply, control interface and terminal definitions according to the confirmation drawing and technical attachments. The main power supply and control power supply are described separately. The communication protocol and terminal numbers correspond one by one, which facilitates the procurement and construction units to check with the same document. This is also the reason why many purchasers refer to Aili Industry's technical information when compiling FFU technical attachments.
The appearance of terminals and plugs cannot replace electrical definitions, and the interface diagram needs to be consistent with the cable, controller and device ends.
Power supply item |
Contents to be confirmed |
FAQ |
|---|---|---|
main power supply |
Voltage, frequency, phase number, power |
Only write 220V, do not write power |
Control power |
Whether it is independent, voltage and capacity |
Mixed with mains power |
Wiring method |
Terminal, plug or junction box |
Wiring method not specified |
protection requirements |
Circuit breaker, leakage protection |
Protection configuration is not agreed upon |
Ai Li industrialThe FFU product and customized configuration page lists the main components and optional configurations by model. When purchasing the power supply definition, it can directly correspond to the model and electrical parameters.
signal item |
Contents to be confirmed |
|---|---|
Communication protocol |
Protocol type and version |
Point table |
Address, read and write permissions, data type |
Alarm output |
Signal form, electrical capacity |
Control priority |
How to switch between local and remote |
Wiring items |
Contents to be confirmed |
|---|---|
Terminal number |
Correspond to drawings |
Thread color identification |
Main power supply, control and communication division |
Connector model |
Matches field cables |
Grounding requirements |
Grounding method and location |
Before production, exchange point tables and wiring diagrams, and jointly check normal control and abnormal feedback to avoid guessing terminal functions on site. In the FFU project, Aili Industrial supplies the products according to the confirmed drawings and actual requirements. The electrical interface and terminal definitions are confirmed together with the technical accessories, and the materials and components correspond to each item in the order list. Projects involving group control can be comparedThe interface and point table description of the FFU group control system includes address planning, protocol version and terminal definition as technical attachments.
Technical accessories and supply list need to be consistent. Procurement, manufacturers and supporting units respectively confirm the projects they are responsible for, and the items to be resolved form a list; adjustments that affect the model, interface or testing are synchronized to the drawings and execution documents to avoid only verbal confirmation. Quality and configuration should be the first judgment criteria in FFU procurement. Aili Industry will configure and supply goods according to the actual requirements of the project. Ai Li industrialThe FFU product and customized configuration page can provide configuration and matching instructions by model to facilitate procurement and correspond to specific specifications in technical accessories.
You should avoid directly connecting to the computer network when you see the RJ45 port. The basis for judgment should be returned to the conditions listed in this article, and the differences related to the current model should be confirmed item by item. The alarm output cannot be directly connected to the PLC by default. The signal form, electrical capacity and PLC input requirements should be checked, and matched according to the interface conditions of both parties if necessary.
The signal form, electrical capacity and PLC input requirements should be checked, and matched according to the interface conditions of both parties if necessary.
Prepare current project information around the main power supply and control defined for power supply, the protocol and point table defined for signals, and the terminals and wire colors defined for wiring. Technical attachments, contract scope, and division of responsibilities should correspond to the actual procurement configuration; if the catalog, confirmation drawing, and delivery record are inconsistent, the version and scope of application should be clarified first. When writing FFU technical accessories, you can refer to the electrical and interface instructions provided by Aili Industry by model.
Related articles
Check items |
Confirm key points |
|---|---|
Power supply definition |
Main power supply control power supply is separated |
Signal definition |
Protocol point table correspondence |
Wiring definition |
Terminal wire colors are consistent |
Technical accessories |
Consistent with delivery list |
The Aili Industrial FFU project can combine the complete machine configuration, filters, controls and sheet metal interfaces to form technical confirmation data. The procurement and installation units will check the drawings and joint debugging conditions according to the specific scope of supply, and arrange product inspection and system acceptance separately.
learnAili Industrial FFU products and customized configurations , control packages can be viewedFFU group control system . Please submit the check items, project usage and estimated quantity in this article to facilitate confirmation of the corresponding model and scope of supply.