Number of views: 4289 Author: Aili Industry Release time: 2026-11-04 Source: Ai Li Industrial
What installation dimensions are required for non-standard ULPA? Interface diagram and direction annotation
Non-standard ULPA filters need to provide dimensions such as shape, installation opening, sealing interface, fastening method and air flow direction. A clear interface diagram is more conducive to reducing rework than just reporting the width, height, and thickness. There is no standard sample to compare with for non-standard customization. If one direction or benchmark is missing on the drawing, the produced filter may not fit into the equipment. Aili Industry isULPA filters can provide drawing verification support to reduce rework at the interface level.The non-standard customization and sample matching of
1. Mark the complete interface information
Drawings should contain datums, units, view orientation, critical tolerances, and revisions. The positions of liquid tanks, flanges, gaskets and pressing parts need to be clear and cannot be confirmed with just an appearance photo.
If the benchmark is not written clearly, the dimensional data cannot be reviewed; if the version is not indicated, different batches may be produced according to different drawings. Please refer to the key points of interface labeling of the liquid tank structure.ULPA ultra-high efficiency filter FAQ and selection guide。
2. Supplementary equipment constraints
Describe the available depth, disassembly and assembly channels, air inlet space and test probe operating space. Thin equipment especially requires checking the assembly relationship between the fan and the filter element at the same time.
If only the size of the filter element is marked but not the equipment constraints, there will be a situation where 'the filter element size is correct and cannot be installed in the equipment'. Please refer to the space restrictions for internal installation of the equipment.the fan filter unit on the EFU equipment side .Instructions related to
3. Direction marking cannot be omitted
When there are mirror installations of the left and right modules of the same device, the air flow and interface directions should be marked on the drawing, and one model cannot be simply copied. If the direction is wrong, the filter and fan may be installed backwards, changing the airflow path.
The air flow direction, loading direction and sealing surface orientation should be marked separately. The direction requirements for ceiling installation can be combined withFFU fan filter unit .Structural verification of
4. Use samples to confirm the fit and then solidify the batch drawings
Check the trial assembly, sealing and test accessibility according to the confirmation drawing, and then solidify the batch drawing. Temporary modifications on site should be fed back simultaneously to avoid using separate sets of drawings and physical objects.
Aili Industry isFor non-standard ULPA filter projects, sample parts can be made first, and the batch can be arranged after confirming that loading, sealing and leak detection are possible. Please refer to the key points for confirming the sealing surface and fastening position.HEPA FAQs and Selection Guide。
5. Related questions and answers
What to do if you don’t have old drawings?
You can first measure and map the equipment interface and check the actual object, but the size information confirmed by both parties should be formed before production. When placing an order based solely on on-site descriptions, the risk of rework is high.
Can photos replace interface diagrams?
Photos help confirm the structure, but information such as datums, tolerances, directions and versions cannot be fully expressed through photos, and drawings are still needed for key matching dimensions.
Why are the direction markings emphasized separately?
Mirror installation and airflow direction errors will not be reflected in the dimensions, but will affect the installation and airflow path, which must be marked separately on the drawings.
6. Related articles
ULPA ultra-high efficiency filter FAQ and selection guide
7. Key points for selection and acceptance inspection
Check items |
Check the key points |
|---|---|
Drawing information |
Datum, Units, View Direction and Version |
Interface details |
Liquid tank, flange, gasket and pressing position |
device constraints |
Available depth, assembly and disassembly access and test space |
direction annotation |
Air flow, loading and sealing surface orientation |
Sample confirmation |
Trial fitting, sealing and leak detection accessibility |
8. Product matching and technical support from Aili Industrial
Aili Industrial canThe ULPA filter size, sheet metal interface, fan space and complete machine assembly are checked under the same drawing.The non-standard ULPA filter project can provide the equipment opening, installation direction, target air volume and testing space. First confirm the sample fit and then arrange the batch. Ceiling projects can be combinedFFU fan filter unit discusses the installation structure, and equipment-side items can be checked at the same timeEFU equipment side fan filter unit . Provide process objectives, installation drawings, operating conditions and acceptance requirements for further communicationULPA ultra-high efficiency filters . Standard specifications, non-standard interfaces, samples and batch matching of The specific parameters and test range are based on the confirmed model and technical documents.