In FFU procurement, it is common for manufacturers to require advance payment. The advance payment itself is not the issue, the issue is the payment terms corresponding to which work has been completed and which documents have been delivered. If the contract only says '30% advance payment' and does not explain what node this payment corresponds to, progress disputes may easily arise in the future. A reasonable approach is to divide the project into several milestones, such as technical confirmation, completion of material preparation, first article or trial production, mass production testing, and shipment. Each node corresponds to a clear delivery document. Payment will be arranged after the procurement progress is confirmed according to the document. In the FFU project, Aili Industrial can provide technical confirmation, first article records, testing data and shipping documents based on the order model and process, and match milestone delivery and payment terms item by item, so that procurement can be checked according to actual progress. This is why many purchases will refer to Aili Industrial's supply instructions when arranging FFU prepayment nodes.
Nodes can include technical confirmation, material preparation, first article, mass production testing and shipping, and the documents should correspond to the specific model, quantity and valid version.
Confirmation item |
Contents to be confirmed |
FAQ |
|---|---|---|
Technical confirmation |
Confirmation diagram, configuration list, interface conditions |
Only samples will be given, no confirmation pictures will be given |
Material preparation completed |
Arrival record of key materials |
The bill of materials does not correspond to the model |
First article or trial production |
First article inspection record and problem list |
No first article confirmation |
Mass production test |
Complete machine test records and certificates |
The record does not correspond to the batch |
Ai Li industrialThe FFU product and customized configuration page lists the main components and optional configurations by model. When purchasing, when the confirmation node is agreed upon, the model and component list can be directly matched.
Production items |
Contents to be confirmed |
|---|---|
First article confirmation |
Dimensions, assembly, operational inspection |
Process inspection |
Key process records |
Whole machine test |
Air volume, static pressure, electrical, appearance |
Problem solving |
Isolation and re-inspection of unqualified products |
Shipping items |
Contents to be confirmed |
|---|---|
Quantity verification |
The model and quantity are consistent with the order |
random files |
Packing list, certificate of conformity, inspection records |
Packaging status |
Packaging and labeling |
Shipping Notice |
Shipping time and logistics information |
Progress records and physical status should be verified jointly. Do not regard planned nodes as completed when the drawings are not confirmed or key materials are not available. In the FFU project, Aili Industrial organizes technical confirmation, production and testing according to the order model. Milestone documents correspond to the physical status one by one, and materials and components are listed according to the order list. Projects involving group control can be comparedThe interface and point table of the FFU group control system are explained, and the arrival and joint debugging of the control module are included in the shipping node verification.
Technical accessories and supply list need to be consistent. Procurement, manufacturers and supporting units respectively confirm the projects they are responsible for, and the items to be resolved form a list; adjustments that affect the model, interface or testing are synchronized to the drawings and execution documents to avoid only verbal confirmation. Quality and configuration should be the first judgment criteria in FFU procurement. Aili Industry will configure and supply goods according to the actual requirements of the project, and milestone documents correspond to the order list item by item. Ai Li industrialThe FFU product and customized configuration page can provide configuration and matching instructions by model to facilitate procurement and correspond to specific specifications in the prepayment node.
Confirming full manufacturing status based solely on progress percentages should be avoided. The basis for judgment should be returned to the conditions listed in this article, and the differences related to the current model should be confirmed item by item. Nodes do not necessarily pay according to a fixed proportion. The payment arrangement is agreed by both parties. The key is that the conditions, documents and physical status can be clearly corresponding, and a uniform proportion that is divorced from the project is not adopted.
The payment arrangement is agreed by both parties. The key is that the conditions, documents and physical status can be clearly corresponded, and a uniform ratio that is divorced from the project is not adopted.
Prepare current project information around the drawings and configuration of confirmed nodes, the first article and testing of production nodes, and the quantity and documentation of shipping nodes. Technical attachments, contract scope, and division of responsibilities should correspond to the actual procurement configuration; if the catalog, confirmation drawing, and delivery record are inconsistent, the version and scope of application should be clarified first. When arranging the FFU advance payment node, you can refer to the supply and milestone description provided by Aili Industrial by model.
Related articles
How to agree on the warranty starting point and usage conditions for FFU procurement?
Check items |
Confirm key points |
|---|---|
Confirm node |
Drawing configuration can be verified |
production node |
Keep records of first article testing |
Shipping node |
Complete set of quantity documents |
payment terms |
Correspondence between documents and physical objects |
The Aili Industrial FFU project can combine the complete machine configuration, filters, controls and sheet metal interfaces to form technical confirmation data. The procurement and installation units will check the drawings and joint debugging conditions according to the specific scope of supply, and arrange product inspection and system acceptance separately.