Number of views: 4653 Author: Aili Industry Release time: 2028-06-09 Source: Ai Li Industrial
In FFU purchase quotations, wires, gateways and controllers are often combined into one item, and it is easy to write 'control package'. This way of writing looks simple in the quotation stage, but it is easy to cause problems in the implementation stage. Power cords and communication lines have different specifications and lengths, gateways and controllers have different functions, and the number of connectors must be counted separately. If the procurement does not require itemized items, and later on-site it is found that there are insufficient wires or insufficient gateway capacity, the additional costs and responsibility interface will not be clear. In the FFU group control package, Aili Industry explains the wires, gateways, controllers and accessories by type, and the power supply and communication are listed separately, which facilitates item-by-item verification of specifications and quantities during procurement. Aili Industrial's FFU manufacturing system covers the control system and complete machine assembly. The control package can be confirmed in the same project as the unit. This is why many purchasers will refer to Aili Industrial's configuration instructions when checking FFU control quotations.
Power supply and communication cannot be mixed as one wire, and interface shapes such as RJ45 cannot represent network protocols. The connection method must be consistent with the unit, gateway and on-site system.
Wire items |
Contents to be confirmed |
FAQ |
|---|---|---|
power cord |
Specifications, length, quantity |
Mixed with communication lines |
communication line |
type, protocol, length |
Specifications not specified |
Connector |
Model, quantity, and who installed it |
The quantity is not counted |
Length confirmation |
Who is responsible for on-site measurements? |
The length of the site has not been agreed upon |
Ai Li industrialThe FFU products and customized configuration page lists the main components and optional configurations by model. When checking the wire list, the purchaser can directly correspond to the model and control package.
Controls |
Contents to be confirmed |
|---|---|
Gateway capacity |
Number of units that can be connected |
control module |
Stand-alone or centralized |
Operation interface |
Touch screen, computer or mobile |
Expansion capabilities |
Will it be necessary to modify the hardware if additional units are added in the future? |
Attachment items |
Contents to be confirmed |
|---|---|
Connector |
Model and quantity |
Installation parts |
Brackets and fixings |
logo |
Line number, address label |
random files |
Point table, wiring diagram, operating instructions |
The included accessories and optional accessories of the controller should be separated, and the total cost should be compared after the on-site construction margin and debugging scope are clear. In the FFU group control project, Aili Industry lists the control modules, gateways and wires item by item in the supply list, and the quotation conditions are consistent with the scope of supply. Projects involving group control can be comparedThe interface and point table description of the FFU group control system includes address planning, protocol version and expansion capacity into the control list.
Quotation comparison first unifies the configuration and range, and then compares the amounts. Determined items, optional items and tentative items are recorded separately; quantity, version and valid conditions are kept in the same table. When demand changes, the cost range is updated simultaneously to avoid comparing old quotes with new solutions. Aili Industry provides item-by-item quotations for FFU control packages based on wires, gateways, controllers and accessories, which facilitates item-by-item verification of purchases. Ai Li industrialThe FFU product and customized configuration page can provide configuration and supporting instructions by model, making it easier to purchase wires and control quotations to correspond to specific specifications.
Estimating line length based on the number of units without considering the site topology should be avoided. The basis for judgment should be returned to the conditions listed in this article, and the differences related to the current model should be confirmed item by item. The controller does not necessarily include all wiring. You should check the manufacturer's list and on-site wiring range. Regular accessories may not cover all the wires required for the project.
You should check the manufacturer's list and the scope of on-site wiring. Regular accessories may not cover all the wires required for the project.
Prepare current project information around the types and lengths of the wire list, the gateways and modules of the control list, and the connection and installation of the accessory list. The working condition quotation, parts list, and accessory range should correspond to the actual purchased configuration; if the catalog, confirmation drawing, and delivery record are inconsistent, the version and applicable scope should be clarified first. When checking the FFU control quotation, you can refer to the control and configuration instructions provided by Aili Industry by model.
Related articles
Check items |
Confirm key points |
|---|---|
Wire list |
Type length sorting |
control list |
Gateway module corresponding |
Accessory list |
Distinguish between connection and installation |
Quotation conditions |
Compare with same range |
Aili Industrial can confirm FFU configuration according to size, air volume and static pressure, filter element, material and control requirements. Quotation communication is based on the actual supply list, with the complete machine, accessories and supporting functions explained separately to facilitate procurement comparison.
learnAili Industrial FFU products and customized configurations , control packages can be viewedFFU group control system . Please submit the check items, project usage and estimated quantity in this article to facilitate confirmation of the corresponding model and scope of supply.