Number of views: 3968 Author: Aili Industry Release time: 2028-05-20 Source: Ai Li Industrial
When inquiring about stainless steel FFU, the purchaser often just writes 'stainless steel box', thinking that in this way, each company is quoting the same material. The actual quotes received may vary significantly. The reason is that stainless steel is just a general term, which includes specific conditions such as grade, plate thickness, surface condition and structural processing requirements. The material costs of 304 and 316 are different, the materials of 1.0 mm and 1.2 mm plate thickness are different, the brushed surface and mirror surface processing procedures are different, and the welding seam, flange and fillet requirements will also affect the processing range. If these conditions are not clearly stated, the quotation will naturally not match. In the FFU quotation, Aili Industry lists the confirmation drawings and material requirements item by item. The box, filter frame, accessories and surface treatment are described separately, which facilitates purchasers to compare prices under the same material conditions. This is why many purchasers will refer to the quotation structure of Aili Industry when checking stainless steel FFU quotations.
Clarify material requirements such as 304 or 316 as well as brushed, mirrored or other treatments. Welds, fillets, flanges and cleaning requirements will affect the processing scope.
Material item |
Contents to be confirmed |
FAQ |
|---|---|---|
Material grade |
304, 316 or other |
Only write stainless steel, do not write the grade |
Plate thickness |
Plate thickness requirements for each part |
Give only one thickness |
surface state |
Brushed, mirror or 2B |
Surface requirements not specified |
Applicable parts |
The box, filter frame and accessories are explained separately. |
All quoted based on the same material |
Ai Li industrialThe FFU products and customized configuration page lists the main components and optional configurations by model. When checking material requirements, procurement can directly correspond to the model and component list.
Processing items |
Contents to be confirmed |
|---|---|
Weld treatment |
Whether it is continuous welding and grinding |
Flange interface |
Size, hole position, sealing method |
Fillet requirements |
Cleaning accessibility and processing methods |
Structural strengthening |
Whether reinforcement or support is needed |
Surface term |
Contents to be confirmed |
|---|---|
surface treatment |
Brushed, mirror, passivated or other |
Cleaning requirements |
Whether degreasing and dust removal are required |
protection method |
Protection during transportation and installation |
Inspection method |
How to accept surface condition |
The material of the accessories and the configuration of the filter element should be checked separately, and the material certificate should correspond to the supply location. Select according to usage conditions and do not regard higher material grades as necessary for all projects. Projects involving group control can be comparedthe FFU group control system includes the installation materials and surface requirements of the control module for verification.The interface and point table description of
Quotation comparison first unifies the configuration and range, and then compares the amounts. Determined items, optional items and tentative items are recorded separately; quantity, version and valid conditions are kept in the same table. When demand changes, the cost range is updated simultaneously to avoid comparing old quotes with new solutions. In the FFU project, Aili Industrial supplies products according to the confirmed drawings and actual material requirements, and the quotation conditions are consistent with the scope of supply. Ai Li industrialThe FFU product and customized configuration page can provide configuration and matching instructions by model to facilitate procurement and correspond to specific specifications in stainless steel FFU quotation comparisons.
You should avoid thinking that the price must be close if they are both stainless steel. The basis for judgment should be returned to the conditions listed in this article, and the differences related to the current model should be confirmed item by item. The stainless steel box does not necessarily mean that all accessories need to be made of the same material. They should be confirmed according to the cleaning, contact and use environment. The supply list can be divided into parts to avoid general requirements.
It should be confirmed according to the cleaning, contact and use environment. The supply list can be divided into parts to avoid general requirements.
Prepare current project information around the required grade and thickness of materials, weld flange fillets required for processing, and cleaning and treatment requirements for surfaces. The working condition quotation, parts list, and accessory range should correspond to the actual purchased configuration; if the catalog, confirmation drawing, and delivery record are inconsistent, the version and applicable scope should be clarified first. When checking the quotation of stainless steel FFU, you can refer to the configuration and quotation instructions provided by Aili Industry by model.
Related articles
How much does one FFU cost? How to form a budget range based on the overall machine configuration
Why do FFU manufacturers’ quotations vary greatly?
Check items |
Confirm key points |
|---|---|
Material requirements |
Grade thickness stated |
Processing requirements |
Weld flange fillet correspondence |
surface requirements |
Cleaning process breakdown |
Quotation conditions |
Compare with same material and same range |
Aili Industrial can confirm FFU configuration according to size, air volume and static pressure, filter element, material and control requirements. Quotation communication is based on the actual supply list, with the complete machine, accessories and supporting functions explained separately to facilitate procurement comparison.
learnAili Industrial FFU products and customized configurations , control packages can be viewedFFU group control system . Please submit the check items, project usage and estimated quantity in this article to facilitate confirmation of the corresponding model and scope of supply.