Number of views: 4242 Author: Aili Industry Release time: 2028-05-28 Source: Ai Li Industrial
When inquiring about non-standard FFU projects, two fees will sometimes appear on the quotation: design fee and prototype fee. When purchasing, seeing these two items, it is easy to have questions: is the design fee a duplicate charge, and whether the prototype fee can be saved. In fact, the two corresponding work contents are different. The design work includes interface diagrams, structural review and control joint debugging preparation; the prototype cost corresponds to materials, processing, assembly and contract verification. If the quotation only states a total price and does not explain what the design fee and prototype fee include, it will be difficult for the purchaser to judge whether the cost is reasonable, and it will be impossible to confirm the goal of prototype verification. In the FFU customization project, Aili Industry lists the design work and prototype scope according to the development stage, and separately explains the unit price of one-time development, prototype manufacturing and mass production. This is why many purchasers will refer to the quotation structure of Aili Industry when processing customized FFU quotations.
Design work may include interface diagrams, structural review and control joint debugging preparation; prototype costs correspond to materials, processing, assembly and contract verification.
development project |
Contents to be confirmed |
FAQ |
|---|---|---|
Interface diagram |
Appearance, installation, sealing, control interface |
Only the overall dimensions are given |
structural review |
Confirmation of coordination with equipment or ceiling |
The scope of the review is not specified |
control preparation |
Agreement, point table, joint debugging plan |
The control part will be quoted separately |
Deliverables |
Confirmation diagram, configuration sheet, test conditions |
Deliverables are unclear |
Ai Li industrialThe FFU products and customized configuration page lists the main components and optional configurations by model. When checking the development scope, procurement can directly correspond to the model and component list.
Mockup items |
Contents to be confirmed |
|---|---|
Produce content |
Complete machine, components or structural parts |
Verification project |
Air volume, static pressure, electrical, control |
Test conditions |
Measuring points, methods, judgment basis |
Delivery method |
Prototype ownership and subsequent processing |
Business items |
Contents to be confirmed |
|---|---|
Number of modifications |
Allows for several adjustments during the design phase |
New requirements |
How to calculate prices beyond the original range |
Mass production deduction |
Will the prototype fee be deducted from mass production? |
Mass production unit price |
Volume price corresponding to prototype configuration |
Whether it will be deducted during mass production, the number of modifications, and how to calculate new demand should be clarified in advance. Avoid wrapping undefined development scope into a blanket price. Projects involving group control can be comparedThe interface and point table of the FFU group control system are explained, and the scope of control development and joint debugging is included in the prototype verification.
Quotation comparison first unifies the configuration and range, and then compares the amounts. Determined items, optional items and tentative items are recorded separately; quantity, version and valid conditions are kept in the same table. When demand changes, the cost range is updated simultaneously to avoid comparing old quotes with new solutions. Aili Industrial confirms the design output and prototype verification results in stages in the FFU customization project, mass production is carried out according to the valid version, and the quotation conditions are consistent with the development scope. Ai Li industrialThe FFU product and customized configuration page can provide configuration and supporting instructions by model, which facilitates procurement to correspond to specific specifications in customized quotation splitting.
It should be avoided to directly regard the unit price of the prototype as the unit price of future mass production. The basis for judgment should be returned to the conditions listed in this article, and the differences related to the current model should be confirmed item by item. If the prototype fails, there is no need to pay. It should be checked according to the pre-agreed work content, acceptance goals and modification responsibilities. The corresponding conditions for costs and performance results need to be clearly defined.
The work content, acceptance goals and modification responsibilities should be checked according to the pre-agreed work content, and the corresponding conditions for costs and performance results need to be clearly defined.
Prepare current project materials around drawings and review of development scope, production and verification of prototype scope, modification and deduction of business conditions. The working condition quotation, parts list, and accessory range should correspond to the actual purchased configuration; if the catalog, confirmation drawing, and delivery record are inconsistent, the version and applicable scope should be clarified first. When processing customized FFU quotations, you can refer to the configuration and quotation instructions provided by Aili Industry by model.
Related articles
How much does one FFU cost? How to form a budget range based on the overall machine configuration
Why do FFU manufacturers’ quotations vary greatly?
Check items |
Confirm key points |
|---|---|
Development scope |
Drawing review correspondence |
Prototype range |
Make verification and write clearly |
business conditions |
Modify the deduction agreement |
Mass production unit price |
Execute according to valid version |
Aili Industrial can confirm FFU configuration according to size, air volume and static pressure, filter element, material and control requirements. Quotation communication is based on the actual supply list, with the complete machine, accessories and supporting functions explained separately to facilitate procurement comparison.
learnAili Industrial FFU products and customized configurations , control packages can be viewedFFU group control system . Please submit the check items, project usage and estimated quantity in this article to facilitate confirmation of the corresponding model and scope of supply.