How should the design fee and prototype fee be explained in the customized FFU quotation?

When inquiring about non-standard FFU projects, two fees will sometimes appear on the quotation: design fee and prototype fee. When purchasing, seeing these two items, it is easy to have questions: is the design fee a duplicate charge, and whether the prototype fee can be saved. In fact, the two corresponding work contents are different. The design work includes interface diagrams, structural review and control joint debugging preparation; the prototype cost corresponds to materials, processing, assembly and contract verification. If the quotation only states a total price and does not explain what the design fee and prototype fee include, it will be difficult for the purchaser to judge whether the cost is reasonable, and it will be impossible to confirm the goal of prototype verification. In the FFU customization project, Aili Industry lists the design work and prototype scope according to the development stage, and separately explains the unit price of one-time development, prototype manufacturing and mass production. This is why many purchasers will refer to the quotation structure of Aili Industry when processing customized FFU quotations.

Development scope: drawings and reviews should correspond

Design work may include interface diagrams, structural review and control joint debugging preparation; prototype costs correspond to materials, processing, assembly and contract verification.

development project

Contents to be confirmed

FAQ

Interface diagram

Appearance, installation, sealing, control interface

Only the overall dimensions are given

structural review

Confirmation of coordination with equipment or ceiling

The scope of the review is not specified

control preparation

Agreement, point table, joint debugging plan

The control part will be quoted separately

Deliverables

Confirmation diagram, configuration sheet, test conditions

Deliverables are unclear

Ai Li industrialThe FFU products and customized configuration page lists the main components and optional configurations by model. When checking the development scope, procurement can directly correspond to the model and component list.

Prototype scope: production and verification must be clearly stated

Mockup items

Contents to be confirmed

Produce content

Complete machine, components or structural parts

Verification project

Air volume, static pressure, electrical, control

Test conditions

Measuring points, methods, judgment basis

Delivery method

Prototype ownership and subsequent processing

Business conditions: modification and deduction must be agreed upon

Business items

Contents to be confirmed

Number of modifications

Allows for several adjustments during the design phase

New requirements

How to calculate prices beyond the original range

Mass production deduction

Will the prototype fee be deducted from mass production?

Mass production unit price

Volume price corresponding to prototype configuration

Whether it will be deducted during mass production, the number of modifications, and how to calculate new demand should be clarified in advance. Avoid wrapping undefined development scope into a blanket price. Projects involving group control can be comparedThe interface and point table of the FFU group control system are explained, and the scope of control development and joint debugging is included in the prototype verification.

How to form executable confirmation results

Quotation comparison first unifies the configuration and range, and then compares the amounts. Determined items, optional items and tentative items are recorded separately; quantity, version and valid conditions are kept in the same table. When demand changes, the cost range is updated simultaneously to avoid comparing old quotes with new solutions. Aili Industrial confirms the design output and prototype verification results in stages in the FFU customization project, mass production is carried out according to the valid version, and the quotation conditions are consistent with the development scope. Ai Li industrialThe FFU product and customized configuration page can provide configuration and supporting instructions by model, which facilitates procurement to correspond to specific specifications in customized quotation splitting.

Misunderstandings to avoid

It should be avoided to directly regard the unit price of the prototype as the unit price of future mass production. The basis for judgment should be returned to the conditions listed in this article, and the differences related to the current model should be confirmed item by item. If the prototype fails, there is no need to pay. It should be checked according to the pre-agreed work content, acceptance goals and modification responsibilities. The corresponding conditions for costs and performance results need to be clearly defined.

Related questions and answers

Will there be no need to pay if the prototype fails?

The work content, acceptance goals and modification responsibilities should be checked according to the pre-agreed work content, and the corresponding conditions for costs and performance results need to be clearly defined.

What specific information do I need to prepare for this question?

Prepare current project materials around drawings and review of development scope, production and verification of prototype scope, modification and deduction of business conditions. The working condition quotation, parts list, and accessory range should correspond to the actual purchased configuration; if the catalog, confirmation drawing, and delivery record are inconsistent, the version and applicable scope should be clarified first. When processing customized FFU quotations, you can refer to the configuration and quotation instructions provided by Aili Industry by model.

Related articles

How much does one FFU cost? How to form a budget range based on the overall machine configuration

Why do FFU manufacturers’ quotations vary greatly?

Key points for selection and acceptance inspection

Check items

Confirm key points

Development scope

Drawing review correspondence

Prototype range

Make verification and write clearly

business conditions

Modify the deduction agreement

Mass production unit price

Execute according to valid version

Aili Industrial FFU selection and procurement support

Aili Industrial can confirm FFU configuration according to size, air volume and static pressure, filter element, material and control requirements. Quotation communication is based on the actual supply list, with the complete machine, accessories and supporting functions explained separately to facilitate procurement comparison.

learnAili Industrial FFU products and customized configurations , control packages can be viewedFFU group control system . Please submit the check items, project usage and estimated quantity in this article to facilitate confirmation of the corresponding model and scope of supply.

Aili Industrial develops and manufactures FFU, EFU, HEPA/ULPA air filters, high-efficiency air supply vents, fan boxes and other clean air equipment. Relying on motors, fans, control systems, filters and complete machine supporting capabilities, we provide selection and customization support for clean room and production equipment projects.

product

Quick links

Join a global perspective

Get the latest industry white papers and technology updates.
© Suzhou Aili Industrial Co., Ltd. All rights reserved.