Number of views: 2215 Author: Aili Industry Release time: 2027-12-04 Source: Ai Li Industrial
FFU procurement verifies the relationship between the sales company and the production factory in order to clarify the responsibility links for contract performance, technical confirmation and quality issues. It does not require that the two must have the same name. What procurement really needs to confirm is whether a clear responsible party can be found in the event of configuration changes, delivery adjustments or quality abnormalities, and that the responsible party can exert control over the manufacturing process. In the FFU project, Aili Industrial can provide corresponding instructions on the manufacturing body, confirmation drawings and testing data around specific models to facilitate procurement to complete this verification.
Record the sales entity, manufacturing entity, invoicing and after-sales entity, and explain who is responsible for drawing confirmation, complete machine testing and production changes. Affiliated companies also need to have clear correspondence between orders and documents.
Subject type |
Contents to be confirmed |
FAQ |
|---|---|---|
Sales entity |
Whether it has contract fulfillment and after-sales capabilities |
Only responsible for business, not technical confirmation |
manufacturing body |
Are you responsible for this order process? |
The relationship with the seller is not specified |
Invoicing subject |
Is it consistent with the contract and payee? |
Multiple entities collect payments, and the responsibility interface is unclear |
After-sale service |
Who is responsible for problem acceptance, judgment and execution? |
Sales and factory blame each other |
Procurement documents can list the actual manufacturing address and technical contact person, so that when configuration or delivery problems occur, the responsible link can be directly found, avoiding the need to rely solely on verbal representations from sales. Drawing confirmation, complete machine testing and production changes should be able to correspond to the specific responsible person, rather than just communicating at the sales level. When it comes to control matching, you can compareThe interface and point table description of the FFU group control system includes the electrical boundaries for confirmation.
Service link |
Contents to be confirmed |
|---|---|
Technical consulting |
Who provides model and configuration instructions? |
Delivery date communication |
Who confirms materials and production scheduling status |
quality feedback |
Who accepts, determines and processes |
Spare parts supply |
Who supplies it by model and version? |
Affiliated enterprises need to explain their relationships and respective responsibilities according to project requirements so that contract, manufacturing and after-sales information can be verified. Ai Li industrialFFU products and customized configurations can provide configuration and supporting instructions by model, which facilitates procurement to check product information simultaneously during the main confirmation stage.
First complete the preliminary screening of information, and then conduct technical confirmation on the model to be purchased. Add unclarified manufacturing, configuration and responsibility issues to a supplementary list, and organize comparisons after the supplier responds. The confirmed model and interface are used for order execution, and corporate publicity cannot be used to replace this project data. The responsible party should be identified for technical validation, delivery schedule changes and quality issues, and the responsible party should be able to exert control over the manufacturing process.
It should be avoided to directly determine the lack of production capacity based on different company names. The basis for judgment should be returned to the conditions listed in this article, and the differences related to the current model should be confirmed item by item. There is no problem if the sales company and the production factory have different names. The key is that the responsibility link is clear and traceable.
The relationship and respective responsibilities need to be explained according to project requirements so that contract, manufacturing and after-sales information can be verified.
Prepare current project information around the sales and manufacturing invoicing of the subject list, design and inspection of technical responsibilities, and problem handling contacts of service responsibilities. The manufacturing site, configuration confirmation form, and complete machine test records should correspond to the actual purchased configuration; if the catalog, confirmation drawing, and delivery record are inconsistent, the version and scope of application should be clarified first.
Check items |
Confirm key points |
|---|---|
Subject list |
Sales manufacturing invoicing correspondence |
technical responsibility |
Design and inspection traceability |
Service Responsibilities |
Clear problem-solving path |
Aili Industrial's FFU manufacturing system covers motors, fans, control systems, sheet metal, filters and complete machine assembly. Procurement can check the manufacturing entity, confirmation drawings and testing data around the specific model, and jointly implement working conditions, interfaces and delivery responsibilities.
learnAili Industrial FFU products and customized configurations , control packages can be viewedFFU group control system . Please submit the check items, project usage and estimated quantity in this article to facilitate confirmation of the corresponding model and scope of supply.