Number of views: 3009 Author: Aili Industry Release time: 2028-04-22 Source: Ai Li Industrial
How much does an FFU cost? This is a frequently asked question when purchasing. But in actual projects, there is no unified answer to this question. The same FFU has different sizes, different fans, different filter elements, different materials, and different control methods, so the price can vary a lot. When purchasing, you can use the online unit price as a preliminary reference, but if you use a single number to make the project budget, it is easy for deviations to occur later. A more practical approach is to first clarify the configuration of the entire machine, and then form a budget range based on the configuration range. Aili Industrial provides configuration and supporting instructions by model in FFU supply, and lists the complete machine, filter element, control and accessories separately, which facilitates procurement to formulate a budget based on actual configuration. This is why many purchases refer to Aili Industrial product information when estimating FFU budgets.
The preliminary budget should first give the specification range and target working conditions, and list the complete machine, filter element, group control, accessories and services respectively. It is not advisable to estimate the unit price based on the workshop area alone.
Configuration items |
Contents to be confirmed |
FAQ |
|---|---|---|
Overall machine size |
Length, width, height and ceiling module |
Only the area is given, not the size. |
Box material |
Cold plate, stainless steel or coating |
Only write stainless steel, do not write the grade |
Drive mode |
AC or EC, speed regulation mode |
No speed regulation requirements specified |
Fan configuration |
Fan model matching the working conditions |
Only give rated air volume |
Ai Li industrialThe FFU product and customized configuration page lists the main components and optional configurations by model. When estimating the budget, procurement can directly correspond to the model and component conditions.
Purification items |
Contents to be confirmed |
|---|---|
Filter grade |
HEPA or ULPA corresponding grade |
Filter element size |
Matches the cabinet opening |
Sealing method |
Beading, sealant or knife edge |
Replacement cycle |
Pressure difference or time judgment |
Supporting items |
Contents to be confirmed |
|---|---|
Control package |
Does it include controller, gateway and cables? |
Install accessories |
Flanges, sealing materials, mounting parts |
Service scope |
Transportation, guidance, debugging, verification |
Delivery schedule |
Partial delivery and on-site receipt |
The supply list and quotation validity period are locked before purchasing and pricing, and undetermined special configurations are listed as items to be confirmed to avoid using incomplete price comparison solutions. Projects involving group control can be comparedThe interface and point table of the FFU group control system are explained, and the control module, gateway and joint debugging scope are included in the budget.
Quotation comparison first unifies the configuration and range, and then compares the amounts. Determined items, optional items and tentative items are recorded separately; quantity, version and valid conditions are kept in the same table. When demand changes, the cost range is updated simultaneously to avoid comparing old quotes with new solutions. Ai Li industrialThe FFU product and customized configuration page can provide configuration and supporting instructions by model, making it easier for procurement to correspond to specific specifications in budget formation.
You should avoid using the online unit price as a project budget without confirming the configuration. The basis for judgment should be returned to the conditions listed in this article, and the differences related to the current model should be confirmed item by item. Manufacturers cannot immediately quote an accurate price, usually because the size, filter element, material and control conditions have not yet been determined, and a quotation for the corresponding model and range cannot be given until the information is complete.
It is necessary to know the specific conditions that can affect production and matching. Only after the information is complete can a quotation for the corresponding model and range be given.
Prepare current project information around the size and material drive of the complete machine configuration, the filter element grade and structure of the purification configuration, and the control of supporting cost and accessory services. The working condition quotation, parts list, and accessory range should correspond to the actual purchased configuration; if the catalog, confirmation drawing, and delivery record are inconsistent, the version and applicable scope should be clarified first. When estimating the FFU budget, you can refer to the configuration and supporting instructions provided by Aili Industry by model.
Related articles
Why do FFU manufacturers’ quotations vary greatly? How to split equipment and service costs
Check items |
Confirm key points |
|---|---|
Overall machine configuration |
Dimensional material driver clear |
purge configuration |
Corresponding filter element grade structure |
Supporting fees |
Control attachment service breakdown |
Quotation conditions |
Validity period and scope are clear |
Aili Industrial can confirm FFU configuration according to size, air volume and static pressure, filter element, material and control requirements. Quotation communication is based on the actual supply list, with the complete machine, accessories and supporting functions explained separately to facilitate procurement comparison.
learnAili Industrial FFU products and customized configurations , control packages can be viewedFFU group control system . Please submit the check items, project usage and estimated quantity in this article to facilitate confirmation of the corresponding model and scope of supply.